Download Print this page

Assembly - HAMPTON BAY PALM BEACH II Use And Care Manual

48-inch ceiling fan
Hide thumbs Also See for PALM BEACH II:

Advertisement

Assembly - Standard Ceiling Mount
1
Preparation for mounting
Remove the canopy ring (JJ) from the canopy (C) by turning the
ring counter-clockwise until it unlocks.
Remove the mounting bracket (A) from the canopy (C) by
loosening the two canopy screws (HH) located in the "L shaped
slots".
Remove and save the two canopy screws (II) in the round
holes. This will enable you to remove the mounting bracket (A).
HH
3
Assembling the fan
Loosen, but do not remove, the setscrew (QQ) on the collar
(M) on top of the fan-motor housing (D).
Align the holes at the bottom of the downrod (B) with the
holes in the collar (M) on top of the fan-motor housing (D).
Carefully insert the hanger pin (CC) through the holes in the
collar (M) and downrod (B). Be careful not to jam the hanger
pin (CC) against the wiring inside the downrod (B).
Insert the locking pin (DD) through the hole near the end of
the hanger pin (CC) until it snaps into its locked position.
Re-tighten the setscrews on the collar (M) on top of the
fan-motor housing (D).
WARNING: Failure to properly install the locking pin could
result in the fan becoming loose and possibly falling.
2
Routing the wires
Route the wires exiting the top of the fan-motor
housing (D) into the decorative motor collar cover (F)
and through the canopy ring (JJ).
Make sure the slot openings are on top and route the
wires through the canopy (C) and then through the ball/
downrod assembly (B).
A
II
C
JJ
CC
7
Please contact 1-855-HD-HAMPTON for further assistance.
C
JJ
B
F
D
C
JJ
B
F
DD
QQ
M
D
HAMPTONBAY.COM

Advertisement

loading

This manual is also suitable for:

59299