Delay Start; Programme Name; Drying Level Cottons; Drying Level Minimum Iron - Miele PDR 507 EL Operating And Installation Instructions

Vented dryer
Table of Contents

Advertisement

Supervisor level

Delay start

The type of time input for the Delay
start function can be changed or
switched off.
– Off
The Delay start function is not
available for selection.
– End of programme (factory setting)
With the Delay start function, you
specify at what time the programme
should end.
– Start of programme
With the Delay start function, you
specify at what time the programme
should start.
– Time until start
With the Delay start function, you
specify after how many hours a
programme should start (up to 96 h).

Programme name

When selecting a standard
programme, the name of the selected
programme is shown in the display.
– Factory setting: On
When a programme is selected, the
programme name is displayed for a
few seconds before the display
shows the main menu.
– Off
The main menu is displayed
immediately.
74

Drying level Cottons

Drying level Minimum iron

Drying level Automatic plus

You can alter the drying levels for the
Cottons, Minimum iron, and Automatic
plus programmes.
Changing this setting leads to increased
energy consumption.
They can be set to one of 7 different
levels.
Factory setting: Normal

Drying level Machine iron

The Machine iron drying level in the
Cottons programme can be
individually adapted.
Changing this setting leads to increased
energy consumption.
You can change the residual moisture in
this programme to one of 11 levels from
16% (drier) to 26% (damper).
Factory setting: 20%

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents