Prerequisites
Required Information
•
Name of asset (ex: Loader #20)
•
Detailed information about the asset (year, make, model, VIN, license plate, etc.)
•
State, area, organization, or group the asset belongs to (ex: North Region, MN tankers, etc.)
•
ESN of each device to be installed (ESN is found on the back of each unit with a barcode)
•
Current hour meter reading on equipment
Required Equipment
TTU 2840
Required Tools
•
Drill and assorted drill bits
•
Slotted and Philips Torx bits (in some cases you may need tamper resistant Torx bits)
•
Small socket set
TURN TO THE LAST PAGE - WRITE DOWN THE REQUIRED INFORMATION!!!
•
Decide where the hardware components will be located and make sure the device is secured
within the cabling distance to the power source.
•
The device must have a clear view to the sky, free from metal obstructions.
•
Ensure that the mounting location has enough integrity to accommodate the additional weight
and vibration of the device.
•
Ensure that the trailer/equipment is connected to a power source to complete and test the install.
•
Additional mounting harware may be needed.
PedigreeTechnologies.com | Support: (701)-499-0022
Power Cable
Before You Begin
2
Mobile Equipment Manager
Fuse Holders (2)
Fuse Taps (4)
2 Regular, 2 Mini
(TTU2830/TTU2840)
TTU 2830
Need help?
Do you have a question about the OneView TTU2830 and is the answer not in the manual?
Questions and answers