Winkhaus AV2 Fabrication And Installation Manual

Winkhaus AV2 Fabrication And Installation Manual

Automatic locking system

Advertisement

Winkhaus AV2 / AV2 E Automatic
Locking System
Fabrication and Installation Manual
Timber and Composite doors

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AV2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Winkhaus AV2

  • Page 1 Winkhaus AV2 / AV2 E Automatic Locking System Fabrication and Installation Manual Timber and Composite doors...
  • Page 2 We always do appreciate suggestions or comments. The electronic automatic locking system can be easily installed, if these operating instructions and the door specifications indicated have been followed. © Winkhaus STV GmbH & Co. KG. All rights reserved. Last revised: 10/2006...
  • Page 3: Table Of Contents

    Sash F24 AV2 Keeps: Full Length Page 12 Routing Details F24 AV2 Keeps: Single Pocket Page 13 F24 AV2 Keeps: One piece full length rounded end Page 14 Frame Routing Details Sash Routing Details Page 15 AV2 & AV2 E 20mm Face Plate Page 15 AV2 &...
  • Page 4: Sash & Frame Preparation

    Carry out all routing for sash and frame hardware, prior to fabrication. Completely remove all burrs and debris, prior to hardware installation. Machining details: Accurate machining and routing is essential for the AV2 / AV2-E locking mechanism. Please refer to pages 12 or 17 1.2 Hardware installation...
  • Page 5: Fabrication Final Checks And Adjustments

    Winkhaus AV2 / E Manual Stand door set vertical and check adjustments and operation. General If machining and keep location is correct and therefore in the optimum position, keep information adjustments should only be necessary on site to assist/fine tune door set installation.
  • Page 6: Installation Set Up

    Winkhaus AV2 / E Manual 2. Installation Procedure 2.1 Installation Set up Plumb: Check by using either a level or plumb line and a straight edge along both the lock and hinge sides. These two uprights should be straight, plumb and parallel.
  • Page 7: General Door Set Up

    Winkhaus AV2 / E Manual Measure air gap from this position. 2.3 General Door Set up Use glass packer General Centre lines: information Sash to frame relationship of Lock to Centre Latch and hook keeps. Please refer to drawings 6.1, 6.2 and 6.3 on pages 12 - 14...
  • Page 8 (If the deadbolt has not been thrown).* Outside 4. From the outside access can only be gained via the key. Turning the key retracts the hooks and the deadbolt (if thrown).* Fixed Pad * AV2/AV2 E also available WITHOUT deadbolt.
  • Page 9: Operating Instructions

    Winkhaus AV2 / E Manual 3. Operating instructions General 4. Routine Maintenance information Regular maintenance reduces costly remedial calls that you may have to attend to during the Fabrication course of a year, therefore ensure that the end user is aware of the need to regularly clean and Procedures lubricate the locking mechanism and associated components.
  • Page 10: Troubleshooting Guides

    Winkhaus AV2 / E Manual 5. Trouble Shooting Guides 5.1 AV2 Locking System (Automatic/Manual) Symptom Fault Remedial action rqd Neither hook throws Keep position incorrect Reposition keeps Incorrect Air gap Adjust air gap to 4mm, - 1mm, + 0 Keep incorrectly adjusted...
  • Page 11: Av2 E Locking System (Electromechanical)

    Winkhaus AV2 / E Manual 5. Trouble Shooting Guides General 5.2 AV2 E Locking System (Electromechanical) information Symptom Fault Remedial action rqd Fabrication The motor is slow to retract the hooks The correct size wire has not been Refer to Operating manual for cable...
  • Page 12: Frame Routing Details

    Winkhaus AV2 / E Manual 6. Frame Routing Details 6.1: F24 AV2 Keeps: Full Length (3 Piece)
  • Page 13: F24 Av2 Keeps: Single Pocket

    Winkhaus AV2 / E Manual 6.2: F24 AV2 Keeps: Single Pocket General information Fabrication Procedures Installation Procedures Operating Instructions Routine Maintenance Troubleshooting Guides Sash Routing Details Frame Routing Details...
  • Page 14: F24 Av2 Keeps: One Piece Full Length Rounded End

    Winkhaus AV2 / E Manual 6.3: F24 AV2 Keeps: One Piece Full Length Rounded End...
  • Page 15: Sash Routing Details

    Winkhaus AV2 / E Manual 7. Sash Routing Details 7.1: AV2 & AV2 E 20mm Face Plate General information Fabrication Procedures Installation Procedures Operating Instructions Routine Maintenance Troubleshooting Guides Sash Routing Details Frame Routing Details...
  • Page 16: Av2 & Av2 E 20Mm Rounded End Face Plate

    Winkhaus AV2 / E Manual 7.2: AV2 & AV2 E 20mm Rounded End Face Plate...
  • Page 17: Av2 & Av2 E 16Mm Face Plate

    Winkhaus AV2 / E Manual 7.3: AV2 & AV2 E 16mm Face Plate Full Length General information Fabrication Procedures Installation Procedures Operating Instructions Routine Maintenance Troubleshooting Guides Sash Routing Details Frame Routing Details...
  • Page 18 Electronic Automatic Locking System in the design: Safety door locking system AV2 + motor control EAV 1 (mounted/not mounted) we shall hereby certify that they conform to the requirements and directives established and stipulated by the Council on the Harmonization of Legal Regulations of Member States regarding...
  • Page 19 Winkhaus AV2 / E Manual Notes:...
  • Page 20 Winkhaus UK Ltd 2950 Kettering Parkway, Kettering, Northants NN15 6XZ Tel: +44 (0)1536 316091 Fax: +44 (0)1536 419091 www.winkhaus.co.uk email: enquiries@winkhaus.co.uk...

This manual is also suitable for:

Av2 e

Table of Contents

Save PDF