RECOMMENDATIONS FOR THE
HYDRAULIC INSTALLATION
•
Thoroughly rinse the system before
connecting the boiler
•
Water treatment is recommended to
prevent corrosion and the formation of
scale in the boiler and piping.
•
If the boiler is to be installed in an
existing system, ACV recommends using
a cleaning agent in the systems.
•
After connecting the hydraulic circuit,
check the absence of leaks.
•
The boiler is designed to operate on a
sealed system (ie. no open vent or feed
and expansion tank).
•
An adequate expansion vessel, sized
accordingly must be installed in the
system
Cold water
Hot water
Essential recommendation for the correct operation of the system
•
The drain valve (7) and safety valve (5) must be connected to the sewage system.
•
The boiler is equipped with a safety valve set at 4 bar.
EN
Installation
HEATING CONNECTION
Make sure to install isolating valves on the
system heating circuit, so as to be able to
drain the boiler, without draining the whole
system.
Typical system - high temperature
1. Isolation valve
2. Circulating pump
3. Filling valve
4. Check valve
5. Expansion vessel
6. Safety valve (built-in - 4 bar)
7. Draining valve
8. Automatic air vent (built-in)
8
1
6
4
5
1
7
3
2
11