Download Print this page

Sealey CCS01 Instructions page 2

Vehicle storage shelter (2.7 x 5.5 x 2mtrs)

Advertisement

4.2.
CONTENTS and ASSEMBLY
Item A
Item B
Item C
Item D
Item E
L/Hand
Item F
R/Hand
Item G
L/Hand
Item H
R/Hand
4.2.1.
Arrange items A such that they are approximately 2.7 mtrs apart (fig.1). Arrange and fix items B and C to each item A using two item N
nut and bolt arrangements (fig.2). Note that the items are handed and should be assembled accordingly. Note that the two items C are
very similar to items D except they are slightly longer. Take care to select the correct items C at this stage.
A
fig.1
4.2.2.
Securely assemble centre spar using items M (M6 x 60 bolt arrangement) (fig.3)
M
© Jack Sealey Limited
A
E
B
C
fig.3
Original Language Version
X2
Item I
X2
Item J
X2
Item K
X20
Item L
X1
Item M
X1
Item N
X10
X10
fig.2
F
B
C
X4
X1
X1
X1
M6 x 60 - X2
M6 x 40 - X24
B
C
A
N
CCS01 Issue 1 13/04/18

Advertisement

loading

This manual is also suitable for:

5054511263350