Terra Universal Pass-Through Installation And Operating Manual

Cleanroom chambers

Advertisement

Quick Links

Installation and Operating Guide
Document No. 1800-07
Cleanroom Pass-Through Chambers
© Copyright 2017 Terra Universal Inc. All rights reserved. • Revised Jul. 2020
Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Pass-Through and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Terra Universal Pass-Through

  • Page 1 Document No. 1800-07 Cleanroom Pass-Through Chambers © Copyright 2017 Terra Universal Inc. All rights reserved. • Revised Jul. 2020 Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 2: Table Of Contents

    Operation and Maintenance......................12 Operation .................................... 12 Maintenance..................................12 Cleaning....................................12 Warranty ............................13 Appendix: Installation Qualification Checklist ................14 Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 3: Description

    Failure to comply with any of the instructions contained in this manual can result in damage to the unit or improper installation, rendering the pass-through inoperable. Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 4: Wall Cut-Out

    CleanMount® designs use lag bolts on either side of the chamber, thus requiring extra clearance in the wall cut-out Figure 1: (from left) Pass-through with Standard Mounting bracket and Pass-through with CleanMount® Mounting Bracket Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 5 Finish the wall cut-out with an appropriate substrate and finishing material. As a general rule, the wall cut-out should have the same grade of finishing as the wall it is installed in (e.g. cleanroom-grade materials). Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 6: Installation For Standard Mounting Brackets

    Section 2.6 Door Alignment. Figure 4: Pass-through with standard mounting brackets, fastened to the wall Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 7: Installation For Cleanmount® Brackets

    Install the bracket covers by snapping each of them into the the body of the pass-through bracket clips (See Figure 8) Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 8 Figure 8: Snap the bracket covers back into place to to the “clean”-side bracket, sandwiching the wall hide the lag bolts and other hardware between the brackets Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 9: Fire-Rated Or Ruggedized Pass-Through Installation

    10. Fasten the bracket to the wall surface only. Do not over-tighten the fasteners as this may bend the bracket and create gaps. 11. Test the pass-through doors again for proper functioning. Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 10: Floor-Mounted Pass-Throughs

    CleanMount® brackets (flush-mount), complete the installation instructions outlined in Section 2.4. Align the floor ramps with the bottom of the pass-through so that the two notches on the rear of the ramp hook onto the studs below the pass-through doors. Push the ramp in until it is flush with the surface of the pass-through and then set it down.
  • Page 11: Door Alignment

    Protruding Exhaust Flange or Filter Housing If the pass-through arrived with either an exhaust flange or an ULPA filter housing preinstalled, these features will need to be detached from the pass-through prior to installation to allow the pass-through to fit through the wall cut-out.
  • Page 12: Operation And Maintenance

    Fold the wiper between strokes, and replace with a clean wiper often. Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...
  • Page 13: Warranty

    Terra Universal. All claims must be made in writing within 90 days of the date the product was shipped. Any claims not made within this time limit shall be deemed waived by the customer.
  • Page 14: Appendix: Installation Qualification Checklist

    Performed by: _________________________________ Date: _________________ Reviewed by: _________________________________ Date: _________________ Comments: Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020...