HEIDELBERG Wallbox Energy Control Installation Instructions Manual page 12

Table of Contents

Advertisement

Installation instructions
2
Fig. 8
Wallbox Energy Control with cover
A.1.8
1
1
Load/energy management (optional)
The Wallbox "Energy Control" can be operated with
load/energy management. This way, the Wallbox can
be operated in various configurations, e.g.:
Operation of several Wallboxes in a network with
monitoring of the power distribution (load man‐
agement),
Operation of one or more Wallboxes with differ‐
ent types of energy supply, e.g. solar energy,
normal power network, ...
For additional information, read the online instructions
"Wallbox Energy Control, Local Load Management
and External Load Management":
https://wallbox.heidelberg.com/
If the Wallbox is operated in load/energy manage‐
ment, the communication lines (RS485 bus) must also
be laid through the multigasket of the cable gland
(Fig. 6/3).
9.
Replace the lid of the electronics housing
(Fig. 4/2) and tighten the four screws (2.5 Nm).
10. Replace the cover, fasten it with the four screws
M4x10 (Fig. 8/1) and tighten them (1.8 Nm). The
four screws are included in the enclosed acces‐
sories.
1
00.999.3040/

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Wallbox Energy Control and is the answer not in the manual?

Questions and answers

Table of Contents