Built-In Tests

The ACU61 device has different built-in tests with optical indication of the test results.
The tests monitor the system equipment and some internal circuits.
o
PBIT: A system self-test starts after power-on.
o
CBIT: A background test routine runs continuously during normal operation.
o
IBIT: An additional test can be manually started.

Power-on Build-In Test (PBIT)

Power-on Build-In Test (PBIT)

There are two procedure to continue, if a failure was found:

Continuous Build-In Test (CBIT)

Continuous Build-In Test (CBIT)

There are two procedure to continue, if a failure was found:

Initiated Build-In Test (IBIT)

Initiated Build-In Test (IBIT)

There are two procedure to continue, if a failure was found:
DV64440.03 Issue 09 November 2019
The ACU6100 powers up with the main system power.
The test routine will be started (test time ca. 4 s).
o
The test status LED (yellow) is on.
After successful test without failure the test status LED is off.
If a failure was found the test status LED (yellow) flashes.
(1) Push at the "TEST" button the failure will be ignored.
o
If there is permanent problem inside the system, it will be found by
the continuous self-test routine and indicated again.
(2) Set the "BACK-UP" switch to slaved or emergency mode (details see
"Emergency Operation" page 60).
A background test routine runs continuously during normal operation.
If a failure was found the test status LED (yellow) flashes.
(1) Push at the "TEST" button the failure will be ignored.
o
If there is permanent problem inside the system, it will be found by
the continuous self-test routine and indicated again.
(2) Set the "BACK-UP" switch to slaved or emergency mode (details see
"Emergency Operation" page 60).
An additional test can be manually started.
Push the key "TEST" (not during transmission).
If a failure was found the test status LED (yellow) flashes.
(1) Push at the "TEST" button the failure will be ignored.
o
If there is permanent problem inside the system, it will be found by
the continuous self-test routine and indicated again.
(2) Set the "BACK-UP" switch to slaved or emergency mode (details see
"Emergency Operation" page 60).
ACU6100
Operation

Built-In Tests

61

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ACU6100 and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF