Download Print this page

GE LOGIQ E9 Service Manual page 342

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
7-5-22
4D Motor Controller
NOTE:
This test requires a 4D probe be connected to the system. This test requires a 4D probe to be
connected to the system.
Name: Presence Test
Description: This test detects the presence of the 4D Motor Controller.
Run Time: 00:01
If this test failed:
1.) Verify USB connection between the Host and the Main Power Supply.
2.) Verify 4D Motor Controller connections in Main Power Supply.
3.) Replace 4D Motor Controller.
Name: Version Test
Description: Displays the 4D Motor Controller version number.
Run Time: 00:01
If this test failed:
1.) Verify USB connection between the Host and the Main Power Supply.
2.) Verify 4D Motor Controller connections in Main Power Supply.
3.) Replace 4D Motor Controller.
7 - 98
5
EV
Section 7-5 - Common Service Desktop
LOGIQ E9 Service Manual

Advertisement

loading