Rutland County Garden Furniture Double Pergola Assembly Instructions Manual

Rutland County Garden Furniture Double Pergola Assembly Instructions Manual

Advertisement

Quick Links

Before you commence the assembly process we recommend that you read these instructions thoroughly beforehand to
familiarise yourself with the assembly process and to also check that you have the correct components. If for any reason you
need assistance, you can find our contact details on the final page of these instructions.
We highly recommend that any assembly is carried out on an open flat, level surface if possible with sufficient space. You will
also require the assistance of at least 2 adults to complete assembly safely.
Please note: For a free-standing pergola you can remove up to 600mm from the bottom of each post prior to commencing construction.

Tools required:

Please Note: The components listed below are those required to build a Double pergola of 3M in size or larger. For the 2.4M
version the braces are 150mm shorter, there are only 3 rafters and 14 x 120mm coachscrews.
96 x 65mm
16 x 120mm
woodscrews
coachscrews
4 x Pre-drilled end
4 x Runners
Rafters
Assembly Instructions
The Double Pergola
10mm socket, No2 Pozidriv screwdriver (or electric driver) , step ladder or
platform.

Components

32 x 70mm
4 x 750mm braces
coachscrews
4 x 650mm braces
1
4 x Posts
4 x Rafters

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Double Pergola and is the answer not in the manual?

Questions and answers

Summary of Contents for Rutland County Garden Furniture Double Pergola

  • Page 1 Components Please Note: The components listed below are those required to build a Double pergola of 3M in size or larger. For the 2.4M version the braces are 150mm shorter, there are only 3 rafters and 14 x 120mm coachscrews.
  • Page 2 Rutland County Garden Furniture Ltd, Ashbourne House, 2 Dovecote Meadows, Aslackby, Sleaford, Lincs, NG34 0HZ. Company No: 7670072 VAT No: 151744027...
  • Page 3 Repeat the commence fitment of the second runner. previous steps and attach the second post to the runner. Rutland County Garden Furniture Ltd, Ashbourne House, 2 Dovecote Meadows, Aslackby, Sleaford, Lincs, NG34 0HZ. Company No: 7670072 VAT No: 151744027...
  • Page 4 Rutland County Garden Furniture Ltd, Ashbourne House, 2 Dovecote Meadows, Aslackby, Sleaford, Lincs, NG34 0HZ. Company No: 7670072 VAT No: 151744027...
  • Page 5 ...before securing them with a 120mm coachscrews driven the top face of the runner to space them correctly... into each end of the rafter. Rutland County Garden Furniture Ltd, Ashbourne House, 2 Dovecote Meadows, Aslackby, Sleaford, Lincs, NG34 0HZ. Company No: 7670072 VAT No: 151744027...
  • Page 6 The Double Pergola Step 17 Step 18 Your Rutland Double pergola is now complete. If you have To attach cladding panels simply align as shown at the base selected the optional cladding kit please see step 18. of the post before screwing into place using 4 x 65mm woodscrews through the pre-drilled holes per panel.

Table of Contents