Download Print this page

Mercia Garden Products Staffordshire 10PTDRK0806-V1 General Instructions Manual

Advertisement

Quick Links

General Instructions
10PTDRK0806-V1
Sta ordshire
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a
Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for up to 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
Pressure Treated Timber
Pressure treating is a chemical process which helps to protect wood against adverse weather which could
lead to rot or insect damage.
The most common chemicals used to pressure treat wood are Alkaline Copper Quaternary (ACQ),
Copper Azole (CA), and Micronized Copper Quaternary (MCQ).
Safety: Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in
pressure treated wood, never burn its sawdust or scraps; instead dispose in a land ll.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
It is advisable to use a hand
saw when cutting roof and
oor boards.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Staffordshire 10PTDRK0806-V1 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Mercia Garden Products Staffordshire 10PTDRK0806-V1

  • Page 1 For assistance please contact customer care on: 01636 880514 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in...
  • Page 2 10PTDRK0806-V1 Please retain product label and instructions for future reference 0806 (Pack A) 0806 (Pack B extension) Front Gable QTY 1 Tee Hinge QTY 7 AI-10DRKFG1808x417 PI-07-0082 OSB Roof Sheet QTY 4 PI-03-0374 Finial QTY 2 L Bracket QTY 4 Shed Diamond PI-07-0012 Turn Button QTY 6...
  • Page 3 Please retain product label and instructions for future reference 0806 - Floor Pack Image of 0806 + extension Purchased Floor Pack parts Floor Pack C QTY 6 AI-10FLOOR599x569 Nail Bag 0806 -Extension Pack Purchased Pack B parts Pack A Pack B Ridge Bar - 27x70x630mm F2770-630mm 30mm screws x30...
  • Page 4 Please retain product label and instructions for future reference Step 1 Step 3 Construct the base bearers using 2x (No. Place the second side panel (No. 2) onto 19 & No. 20). This will create the base for the the base framing and x together to the Dog Kennel.
  • Page 5 Please retain product label and instructions for future reference Step 5 Step 7 *If you have purchased an extension pack Fix the mesh Panels (No. 6) into position B then skip to pack B step 1a . and secure with 4x50mm screws per panel, making sure you screw from the Place the remaining bearers (No.
  • Page 6 Please retain product label and instructions for future reference Step 9 Step 11 Use the ridge bars (No. 18 & No. 21) to Fix the assembled roof panels to the position the L brackets (No. 13) marking a building with 12x30mm screws per roof line with a pencil.
  • Page 7 Please retain product label and instructions for future reference Step 13 Step 15 Fix the 4x T Hinges (No.11) onto the doors Fix the cover trims (No. 23) to the corners (No. 7 & 8) and door frame as shown with of the building 7x30mm screws.
  • Page 8 Please retain product label and instructions for future reference Step 17 Attach the fascias (No. 17) to the front and rear of the building with 4x40mm screws per fascia. Once in place, cut of the excess material of the fascia with a hand saw. Fix on the Finials (No.
  • Page 9 Please retain product label and instructions for future reference Pack B Step 3a Step 1a Fix the mesh Panels (No. 4) into position and secure with 4x50mm screws per Place the Base bearers (No. 20, 24 & 36) panel. into position and secure to each with 2x70mm screws.
  • Page 10 Please retain product label and instructions for future reference Step 6a Step 4a Use the ridge bars (No. 18, No. 32 & No. Fix the mesh Panels (No. 6) into position 21) to position the L brackets (No. 13) and secure with 4x50mm screws per marking with a pencil.
  • Page 11 Please retain product label and instructions for future reference Step 8a Fix the Eaves Frames (No. 22) to the Step 10a longest side of the(No. 10) roof OSB. Fix eaves frame (No. 37) to the shortest Fix the building to the Base Framing side of the (No.
  • Page 12 Please retain product label and instructions for future reference Step 12a Step 14a Fix the T Hinges (No.11) onto the doors Cut the Felt (No. 27, 28 ) into 3 sheets and lay (No. 7 & 8) and door frame as shown with onto the roof.
  • Page 13 Please retain product label and instructions for future reference Step 1b Step 16a Slot the ooring (No. 38) into the dog run Fix the 3x T hinges (No. 11) onto the door if you’ve purchased pack C. (No. 5) and door frame as shown in the previous diagram.