OPERATION Maximum Steam Pressure: 20 psi (1.4 kg/cm Electrical Ratings Pump Circuit Rating (Amperes) Voltage Full Load Locked Rotor Pilot Duty 120 VAC 44.4 125 VA at 240 VAC 120 or 240 VAC 22.2 Note: 11 MV is rated at 24 VA @ 24 VAC to 120 VAC The Series 67 and Series 767 low water cut-offs are a 2-1/2"...
Page 3
STEP 2 - Preparation a. Turn the boiler off. b. Drain the water in the boiler to a level which is below the lower gauge glass tapping (B) of the control body (A). Allow the boiler to cool to 80˚F (27˚C) and allow the pressure to release to 0 psi (0 bar).
Page 4
c. Using an adjustable wrench, install a a" (9.5mm) NPT compression fitting base (K) to the upper tapping (L) in the control (A). Tighten to 31 ft•lb (42 N•m). d. Using a pipe wrench, install a 2" (13mm) nipple (M) into the upper tapping (N). Tighten to 31 ft•lb (42 N•m).
Page 5
g. Position the tubing (Q) next to the compression fitting (K) and, using a pencil, mark the tubing (Q) for proper insertion into the compression fitting (K). Remove the tubing (Q), and, using the tube cutter, cut the tubing to its proper length. h.
Page 6
k. Using two (2) pipe wrenches, rotate the upper tee (P) clockwise and the lower tee (J) counter- clockwise so that the end of the tube can be inserted into the lower compression fitting (K). NOTE: Make sure that the control is in a hori- zontal position.
Page 7
b. Install the control (A) by rotating it onto the 22" (63.5mm) nipple (X, as shown in Step a on previous page). Tighten to 109 ft•lb (148 N•m). c. Using a pipe wrench, install a w" (19mm) NPT pipe (T) into the opening of the blow down valve (U) and tighten to 47 ft•lb (64 N•m).
Page 8
STEP 4 - Electrical Wiring Directory: 67 Low Water Cut-Off and Uni-Match Water Feeder page 8 - 9 67 Low Water Cut-Off and 101 Water Feeder page 10 - 11 For 67 Low Water Cut-Off Installed with McDonnell & Miller Uni-Match Water-Feeder WARNING •...
Page 10
For 67 Low Water Cut-Off Installed with McDonnell & Miller Series 101-A Water-Feeder a. Using a flathead screwdriver, remove the one (1) screw that secures the low water cut-offs switch housing (Y). b. Using a flathead screwdriver, remove the two (2) screws that secure the feeder cover (BB).
Page 11
For the 24V Burner/24V Feeder setups. c. Connect the "hot" wire from the boiler trans- former to terminal #2 of the low water cut-off. BURNER 120 VAC Connect the "hot" side of the water feeder SUPPLY transformer to terminal #3 of the low water cut-off.