STEP 1: SITE PREPARATION 3 Section Frame Kit 1. Select an area that is as level as possible and free of debris and obstacles. 2. Layout hole locations according to kit and net size. All measurements are from center to center. 3.
Page 3
STEP 2: UPRIGHT & CROSSBAR ASSEMBLY 1. Unpack frame sections from boxes. Each box includes 1 complete frame section. 2. Slide reduced end of Part B into end of part A. Connect with 5/16" x 3" bolt. See Diagram-1 and Detail-1. This creates your left side upright. Be sure to align bolt hole locations of uprights so that holes are facing the length of the frame.
Page 4
STEP 3: EYEBOLT & PULLEY INSTALLATION 1. Insert and tighten eyebolts in crossbar (and elbow as needed for 14' wide tunnel nets) as per Diagrams below. Diagram-2 G - Holes for Winch Attachment H - Holes for Member connection I - Eyebolt Location for 14' Tunnel J - Eyebolt Location for 12' Tunnel K - Center Eyebolt Location H - Holes for Member connection...
Page 5
4 CABLE ROUTING & WINCH INSTALLATION 1. Start by looping end of cable through corner eyebolt opposite of winch Diagram-2 and secure it with the cable clamp. 2. Thread the cable through the remaining eyebolts and pulleys as shown on diagram below. G - Holes for Winch Attachment 3.
Page 6
STEP 5: NET INSTALLATION 1. Stretch out batting tunnel net on ground inside frame. 2. Locate top net corners. Starting at one end, clip the net corners and center rope to cable using the snap links provided. Use 14 snap links per cable length.
Need help?
Do you have a question about the ProCage BATTING TUNNEL FRAME KIT and is the answer not in the manual?
Questions and answers