Download Print this page
TSI Instruments ProCage BATTING TUNNEL FRAME KIT Assembly Instructions Manual
TSI Instruments ProCage BATTING TUNNEL FRAME KIT Assembly Instructions Manual

TSI Instruments ProCage BATTING TUNNEL FRAME KIT Assembly Instructions Manual

Advertisement

Quick Links

Trigon Sports International
488 Cumberland Avenue
Memphis, TN 38112
Phone: (888) 313-1303
NOTE: Purchaser must be responsible for compliance with
any local or state building codes pertaining to this product.
Manufacturer, distributor, or any of their representatives will
assume no liability for code compliance.
Copyright 2015
ProCage™ BATTING TUNNEL FRAME KIT
Assembly Instructions
Trigon Sports International, Inc
ITEM
DESCRIPTION
A
Upright A, 76 3/4" (4 holes)
B
Upright B, 76 3/4" (2 holes)
C
Elbow, 16 1/2" (4 holes)
D
Cross Member, 86"
E
Cross Member, 86"
F
Ground Sleeve, 30"
L
5/16" x 3" Hex Bolt
M
5/16" Lock Washer
N
5/16" Lock Nut
5/16" x 4" Eyebolt
Pulley / Eyebolt Assembly
Spring Hooks
1/8" Steel Cable
1/8" Wire Rope Clamp
Manual Winch
QTY
1 / Frame Section
3 / Frame Section
2 / Frame Section
1 / Frame Section
1 / Frame Section
2 / Frame Section
24 Total
36 Total
36 Total
7 Total
5 Total
42 Total
285' Total
1 Total
1 Total
Page 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the ProCage BATTING TUNNEL FRAME KIT and is the answer not in the manual?

Questions and answers

Summary of Contents for TSI Instruments ProCage BATTING TUNNEL FRAME KIT

  • Page 1 ProCage™ BATTING TUNNEL FRAME KIT Assembly Instructions Trigon Sports International 488 Cumberland Avenue Memphis, TN 38112 Phone: (888) 313-1303 ITEM DESCRIPTION Upright A, 76 3/4" (4 holes) 1 / Frame Section Upright B, 76 3/4" (2 holes) 3 / Frame Section Elbow, 16 1/2"...
  • Page 2: Step 1: Site Preparation

    STEP 1: SITE PREPARATION 3 Section Frame Kit 1. Select an area that is as level as possible and free of debris and obstacles. 2. Layout hole locations according to kit and net size. All measurements are from center to center. 3.
  • Page 3 STEP 2: UPRIGHT & CROSSBAR ASSEMBLY 1. Unpack frame sections from boxes. Each box includes 1 complete frame section. 2. Slide reduced end of Part B into end of part A. Connect with 5/16" x 3" bolt. See Diagram-1 and Detail-1. This creates your left side upright. Be sure to align bolt hole locations of uprights so that holes are facing the length of the frame.
  • Page 4 STEP 3: EYEBOLT & PULLEY INSTALLATION 1. Insert and tighten eyebolts in crossbar (and elbow as needed for 14' wide tunnel nets) as per Diagrams below. Diagram-2 G - Holes for Winch Attachment H - Holes for Member connection I - Eyebolt Location for 14' Tunnel J - Eyebolt Location for 12' Tunnel K - Center Eyebolt Location H - Holes for Member connection...
  • Page 5 4 CABLE ROUTING & WINCH INSTALLATION 1. Start by looping end of cable through corner eyebolt opposite of winch Diagram-2 and secure it with the cable clamp. 2. Thread the cable through the remaining eyebolts and pulleys as shown on diagram below. G - Holes for Winch Attachment 3.
  • Page 6 STEP 5: NET INSTALLATION 1. Stretch out batting tunnel net on ground inside frame. 2. Locate top net corners. Starting at one end, clip the net corners and center rope to cable using the snap links provided. Use 14 snap links per cable length.