Hoisting Transport - Sungrow SG250HX User Manual

Pv grid-connected inverter
Hide thumbs Also See for SG250HX:
Table of Contents

Advertisement

User Manual

4.4.2 Hoisting Transport

Release the sealing screws on the mounting ears with a flat-head screwdriver and store them properly.
Step 1
Step 2
Anchor two M12 thread lifting rings to the mounting ears of the inverter:
Lead the sling through the two lifting rings and fasten the tie-down strap.
Step 3
Hoist the inverter and stop to check for safety when the inverter is 100mm above the ground. Continue hoisting the device to the
Step 4
destination after ensuring the safety.
Remove the lifting rings and reassemble the sealing screws released in Step 1.
Step 5
Keep the inverter balanced throughout the hoisting process and avoid collisions with walls or other objects.
Do not hoist in severe weather conditions such as heavy rain, thick fog, or strong wind.
The lifting rings and the sling are not within the delivery scope.
17
4 Mechanical Mounting

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents