Page 1
— I N S TA L L AT I O N , O P E R AT I O N A N D M A I N T E N A N C E M A N UA L TPME and TPHE NSBX and NSWM series Integral SPDs for OEM factory installation •...
G U I D E TO I N S TA L L AT I O N A N D A S S I S TA N C E , P R E - I N S TA L L AT I O N C H E C K L I S T —...
Page 4
T P M E A N D T P H E N S B X A N D N S W M S E R I E S I N T E G R A L S P D S —...
Page 5
P R E - I N S TA L L AT I O N R E Q U I R E M E N T S , I N S TA L L AT I O N — Pre-installation requirements —...
Page 6
4. Circuit breaker (OEM) A dedicated circuit breaker is not required for TPME or TPHE models. If a dedicated branch breaker is to be used to connect the SPD to the power system, ABB recommends Ground Phase A/line 1 a 60 A or higher rated breaker.
I N S TA L L AT I O N , O P E R AT I O N — — Installation Operation After applying power to the SPD, verify that the protection WARNING monitoring circuits are functioning correctly. If all status alarms indicate “normal,”...
— Servicing/troubleshooting Maintenance ABB does not provide a specific schedule for preventative Should a condition occur that results in premature failure of maintenance as conditions will vary based on location and the SPD, the integral SPD suppression thermal fusing will safely the environmental factors presented at each installation site.
This manual is also suitable for:
Tphe nsbx seriesNswm seriesTpme 120sTphe 120sTpme 120yTphe 120y...
Show all
Need help?
Do you have a question about the TPME Series and is the answer not in the manual?
Questions and answers