1.0 SAFETY INFORMATION
The provision of the electrical supply and the connection of the unit to the electrical supply
must be carried out by a qualified electrician in accordance with latest edition of the wiring
regulations.
Isolate from power supply before removing any covers. During installation / maintenance ensure
all covers are fitted before switching on the mains supply.
All-pole disconnection from the mains as shown in the wiring diagram must be incorporated
within the fixed wiring and shall have a minimum contact separation of 3mm in accordance with
latest edition of the wiring regulations.
This unit must be earthed.
Ducting must be securely fixed with screws to the spigot to prevent access to live parts. Duct
runs terminating close to the fan must be adequately protected by suitable guards.
If the supply cord is damaged, it must be replaced by the manufacturer, its service agent or
similarly qualified persons in order to avoid a hazard. The replacement cord must be of the same
technical specification as the original cord or greater.
Precautions must be taken to avoid the back-flow of gases into the room from the open flue of
gas or other fuel-burning appliances.
This appliance should not be used by children or persons with reduced physical, sensory or
mental capabilities or lack of experience and knowledge, unless they have been given supervision
or instruction concerning the safe use of the appliance by a person responsible for their safety.
Children shall not play with the appliance. Cleaning and user maintenance shall not be carried
out by children.
1.1 Hazard Symbols
REFER TO INSTRUCTION MANUAL
Read and understand the installation and maintenance manual before installing,
operating or maintaining this product.
1.2 Important Information
This manual contains important information on the safe and
appropriate assembly, transport, commissioning, operation,
maintenance, disassembly and simple troubleshooting of the product.
While the product has been manufactured according to the accepted
rules of current technology, there is still a danger of personal injury or
damage to equipment if the following general safety instructions and
the warnings contained in these instructions are not complied with.
•Read these instructions completely and thoroughly before
working with the product.
•Keep these instructions in a location where they are accessible
to all users at all times.
•Always include the operating instructions when you pass the
product on to third parties.
Nuaire |
Western Industrial Estate
MRXBOX-ECO2-AE (Standard Unit)
MRXBOX-ECO2-AE-OH (Opposite hand Unit)
MRXBOXAB-ECO2-AE (Standard Unit)
MRXBOXAB-ECO2-AE-OH (Opposite hand Unit)
Mechanical Ventilation Units with Heat Recovery for Wall Mounting
Installation Manual
|
|
| nuaire.co.uk
Caerphilly
CF83 1NA
1.3 Personal Protective Equipment
The following minimum Personal Protective Equipment (PPE) is
recommended when interacting with Nuaire product:
•Protective Steel Toed Shoes - when handling heavy objects.
•Full Finger Gloves (Marigold PU800 or equivalent) - when
handling sheet metal components.
•Semi Fingerless Gloves (Marigold PU3000 3DO or equivalent)
- when conducting light work on the unit requiring tactile
dexterity.
•Safety Glasses - when conducting any cleaning/cutting operation
or exchanging filters.
•Reusable Half Mask Respirators - when replacing filters which
have been in contact with normal room or environmental air.
Nuaire would always recommend a site specific risk assessment by a
competent person to determine if any additional PPE is required.
04. 12. 20. Document Number 671824
EMC Directive
2014/30/EU
LVD Directive
2014/35/EU
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MRXBOX-ECO2-AE and is the answer not in the manual?

Questions and answers

Summary of Contents for NuAire MRXBOX-ECO2-AE

  • Page 1 •Always include the operating instructions when you pass the have been in contact with normal room or environmental air. product on to third parties. Nuaire would always recommend a site specific risk assessment by a competent person to determine if any additional PPE is required. Nuaire | | nuaire.co.uk...
  • Page 2: Wall Mounting

    All mains wiring must be in accordance with the current I.E.E. Regulations, or the appropriate standards. Ensure that the mains supply (Voltage, Frequency and Phase) complies with the rating label. Nuaire | | nuaire.co.uk 04. 12. 20. Document Number 671824 Western Industrial Estate...
  • Page 3: Condensate Drain

    4. If the condensation pipe is fitted in an unheated space the pipe MVHR-DRAIN should be in insulated to prevent freezing. Condensate drain, uninsulated drain Nuaire recommend MVHR-DRAIN be used as the primary pipe with min 5 fall running to SVP. condensate take-off (Figures 9 and 10).
  • Page 4 300mm from a gas boiler balanced flue. Guide” www.planningportal.gov.uk/buildingregulations/approved documents/partl/compliance Installers are advised to be aware of the requirements of this standard when installing ‘through the wall’ supply air ducting. Nuaire | | nuaire.co.uk 04. 12. 20. Document Number 671824 Western Industrial Estate Caerphilly...
  • Page 5 172 CR S Ø125.0 Condensate drain Condensate drain connection (standard connection configuration) (opposite hand 70 6 configuration) Condensate drain connection on centre line of unit Nuaire | | nuaire.co.uk 04. 12. 20. Document Number 671824 Western Industrial Estate Caerphilly CF83 1NA...
  • Page 6 Nuaire MVHR unit. MVHR-DRAIN Condensate drain, uninsulated drain pipe with min 5 fall running to SVP. ALSO FROM NUAIRE - range of thermal ducting, an all-in-one insulated ducting system (see installation document 671780) Nuaire | | nuaire.co.uk 04. 12. 20. Document Number 671824...
  • Page 7: Electrical Installation

    Switches Optional 3 Speed Switch (Double Pole) Kitchen Switch Optional Controls - For further information regarding optional controls, contact Nuaire on 02920 858 400. Nuaire | | nuaire.co.uk 04. 12. 20. Document Number 671824 Western Industrial Estate Caerphilly CF83 1NA...
  • Page 8: Maintenance

    The unit has the ability to override both speed 1 and speed 2 to operate the fan to maximum airflow. See wiring diagram for details of operating Nuaire recommend that filters are inspected every 6 months and this facility. replaced every 12 months. A flashing LED (Section 6.3) will indicate that a filter change is required.
  • Page 9: Warranty

    Please call After Sales Support for further information on items not listed above. Ensure that Nuaire product is made safe from any electrical / water / refrigerant supplies before dismantling commences. This work should only be undertaken by a qualified person in accordance with local authority regulations and guidelines, taking into account all site based risks.
  • Page 10 MRXBOX(AB)-ECO2-AE Installation Manual NOTES Nuaire | | nuaire.co.uk 04. 12. 20. Document Number 671824 Western Industrial Estate Caerphilly CF83 1NA...
  • Page 11 MRXBOX(AB)-ECO2-AE Installation Manual NOTES Nuaire | | nuaire.co.uk 04. 12. 20. Document Number 671824 Western Industrial Estate Caerphilly CF83 1NA...
  • Page 12 MRXBOX(AB)-ECO2-AE Installation Manual NOTES Nuaire | | nuaire.co.uk 04. 12. 20. Document Number 671824 Western Industrial Estate Caerphilly CF83 1NA...

This manual is also suitable for:

Mrxbox-eco2-ae-ohMrxboxab-eco2-aeMrxboxab-eco2-ae-oh

Table of Contents