RAULAND-BORG CORPORATION
Table of Contents
Introduction ................................................................................................ 1
FCC Requirements ...................................................................................... 2
Initial System Installation and Checkout ..................................................
Checkout Internal Communication System ............................................
Introduction
This manual provides instructions for installing and testing a Telecenter IV. Except for the
procedure covering initial system installation and checkout, procedures for installing and
checking-out the internal and interconnected communications systems are kept separate.
Use only the procedures applicable to the site requirements.
Unless otherwise stated, the procedures assume the central chassis has been wired at the
factory, DIP switches have been preset, and the installer has a completed copy of the
System Planning Worksheet.
Special Note:
If interconnecting a Telecenter IV to the public utility, read the
before beginning installation.
©
1989 Rauland-Borg Corporation (Orig. 10/88; Rev. l/89)
Telecenter® IV
Installation
3450 West Oakton Street, Skokie, Illinois 60076-2951
l
l
Page
3
8
12
13
Requirements
FCC
Installation
KI-1583A
(708) 679-0900
Page 1 of 20
Need help?
Do you have a question about the Telecenter IV and is the answer not in the manual?
Questions and answers