Summary of Contents for ZORN INSTRUMENTS ZFG 3000 GPS
Page 1
User Manual for the Light Weight Deflectometer ZFG 3000 GPS ZFG 3000 ECO in accordance with the German technical test requirements for soil and rocks in road construction TP BF – StB Part B 8.3 Benzstraße 1, 39576 Stendal (Germany) Phone: +49(0) 3931 / 25273 0, Fax: +49(0) 3931 / 25273 10 www.zorn-instruments.de...
1.Intended purpose The dynamic plate load test with the help of the ZFG 3000 Light Weight Deflectometer is a rapid method of determining the dynamic deflection modulus E [MN/m² . This allows conclusions to be made about the load-bearing capacity and compaction of soils. In accordance with German regulations TP BF-Stb Part B8.3, the procedure can be used on mixed-grained and course-grained soils up to a grain size of maximum 63 mm, loose base courses, backfill material and for soil improvement.
ZFG 3000 11.02.09 11:58:37 Batt: Zorn Instruments The current date/time and battery status are displayed. Please insert the SD card now. to enable data to be saved on the SD card.
<ON/OFF> Cancels text inserting and starts measuring (no text will be used) When a text was used, it will be saved and is shown as a suggestion at the next measuring. When text ends with a number, the number will be increased at the next measure. When the text input function was cancelled, next text input starts with an empty string.
3.6 Evaluating and printing the results The following results are displayed: 52°35.14’ 11°52.66’ No: 33 11.03.09 13:22 : 0.266 mm s/v: 2.414 : 84.59 MN/m geographical coordinates consecutive number (only if SD card is inserted), date and time ...
4. Menu If you press the <Mode> button, you can call up additional device functions. Use the <Ok> button to confirm the menu command selected. Quit the menu by pressing the <On/Off> button. 4.1 Measuring See chapter 2. and 3. 4.2 Read card (display data saved to SD card) ...
4.5 Setting the clock Select the Set clock menu command in the menu (see 4.). You can use the <Mode> button to select the date or time, or to move the cursor to the position you require. You can change the underlying value by pressing the <+> or <-> buttons. ...
5. Printer The integrated printer is a thermal printer. This requires thermal paper only for printing. To change the thermal paper roll, open the printer compartment by pulling the access depression upwards. Take the empty thermal paper roll out and replace it with a full one. When replacing the thermal paper roll, please ensure that the full thermal paper roll is inserted with the side to be unwound facing to the left and downwards! (Figure 5.1).
8. Instructions for engaging fall weight When engaging the fall weight in the release mechanism, please use both thumbs as shown in the sketch. The fall weight is lifted up as far as possible with both hands until shortly underneath the limit stop so that it can be pressed into the stop using both thumbs as shown in the sketch.
11. Technical data for settlement gauge Measuring device dimensions 300x270x170 mm Measuring device weight approx. 4 kg Settlement measuring range 0.3 to 5 mm ± 0.02 mm Sensor acceleration range ±100 g Frequency range 0 to 500 Hz Temperature range 0 to 50 °...
14. Correlations For information purposes only, no guarantee of information correctness. Quote from German ZTVE- STB 09, Research Institute for Road and Traffic (Edition 2009) 4.5.2 Requirements for deflection modulus The information provided below is based on the 10% minimum quantile. When constructing roads of Construction Classes SV and I to IV (see A &...
Page 16
Table A Number of authoritative traffic load construction class more than 3200 1800 to 3200 900 to 1800 300 to 900 60 to 300 10 to 60 up to 10 Table B Road type construction class Highway SV, I, II main street, walking path with a heavy traffic load II, III walking path with traffic load...
Page 17
For information purposes only, no guarantee of information correctness Quote from Ril 836, Deutsche Bahn AG (German Rail), (20.12.1999 a) 836.0501 Ril 836 - Designing, constructing and maintaining earthworks Page 10 Soils body Principles Fig. 2 Normal requirements for the construction of rail tracks on soil bodies Route type Formation...
Page 18
For information purposes only, no guarantee of information correctness Construction material and soil engineering institute, Wetzlar Backfilling of trenches Verification of compaction with light drop weight tester in accordance with TP BF-StB Part 8.3 Indicators for the allocation of Compaction ratio D Dynamic deflection modulus E Required Based on guide...
15. Warranty We provide 12 months warranty from date of delivery for all deficiencies that occur on our equipment in the manner that we choose to either repair any deficiency free of charge or replace damaged (faulty) parts with new ones. No warranty claims can be made especially for damage caused by improper use;...
17. Software (short manual) A detailed manual for using the software is located on installation CD or is available on software by pushing „F1“ resp. in menu in Help/Show Manual. Installation Supported operating systems: Windows 2000, XP, Vista, 7 1. Put the installation CD in the CD drive 2.
Need help?
Do you have a question about the ZFG 3000 GPS and is the answer not in the manual?
Questions and answers