Download Print this page

Advertisement

Quick Links

ECONOV
SULkY
with
C
onneCting the kit
Opening/Closing of the left-hand chute
Opening/Closing of the the right-hand
Manual and general mode
The following instructions are provided so that the equipment
can be started quickly using the two main menus:
• hoMe
• ConFigUration
a
LSo reFer to the ManUFaCtUrer
Réf: 400 667- 01
gUidanCe bar
QUICK INSTRUCTIONS
.
Top
port
Automatic mode
- GB /DIS
Integral guidance bar.
Power button
USB port with rubber
Zoom/work display
Illuminated touch screen
chute
'
S inStrUCtion ManUaL
-1-

Advertisement

loading

Summary of Contents for Sulky ECONOV

  • Page 1 ECONOV SULkY with gUidanCe bar QUICK INSTRUCTIONS onneCting the kit port Integral guidance bar. Power button USB port with rubber Zoom/work display Illuminated touch screen Opening/Closing of the left-hand chute Opening/Closing of the the right-hand chute Manual and general mode...
  • Page 2 CONFIGURATION...
  • Page 3 LOADING THE SPREADER PROFILE...
  • Page 4: Additional Settings

    ADDITIONAL SETTINGS Enter the height of the antenna «Spreader» It configures itself automatically when the profile is being loaded. Enter the distance between the antenna and the centre of the spreader. For information.
  • Page 5: Tool Configuration

    TOOL CONFIGURATION Launch the guidance line...
  • Page 6 Finalise the outline Continue spreading following the guidance lines. Disable the «Auto» mode.