SUN2000-(20KTL, 29.9KTL, 30KTL, 36KTL, 40KTL)-
M3
User Manual
4.4 Moving the SUN2000
Procedure
Step 1 Lift the SUN2000 from the packing case and move it to the specified installation
position.
Issue 01 (2020-10-15)
Figure 4-5 Three-layer triangle installation (not recommended)
Figure 4-6 Stacked installation (not recommended)
NO TE
The installation diagrams are for reference only and are irrelevant to the SUN2000
cascading scenario.
Copyright © Huawei Technologies Co., Ltd.
4 Installation
21