Step 5—Connect Loads (equipment to be powered)
Load voltage is marked on the charger ratings label.
Load connections are to the terminal blocks in the DC Output Box.
Load terminal block (TB) is behind the Battery terminal block.
Each TB position is marked with its connection: BAT1+, BAT1-, BAT2+, BAT2-, 125V DC+, 125V DC-, 24VDC+, 24VDC-, 48VDC+, 48VDC-.
1. Verify that equipment being powered accepts the charger output voltage.
2. Verify all DC breakers (DC1, DC2) are OFF.
3. Remove the DC Output Box cover - 4 thumbscrews.
4. Connect Load 1 Positive cable to the Positive terminal block position marked Load 1.
5. Connect Load 1 Negative cable to the Negative terminal block position behind the positive position marked Load 1.
6. If DC2 Breaker is labeled "Load", Repeat from 4. for Load 2.
7. Replace the DC Output Box cover - 4 thumbscrews.
Battery
Screws
with 2 DC Load breakers
(Shown as –125VDC)
Bottom Feed
GE 601 Shiloh Rd. Plano, TX 75074 1- 877-546-3243 Outside U.S.A. 1-972-244-9288
GE 601 Shiloh Rd. Plano, TX 75074 1- 877-546-3243 Outside U.S.A. 1-972-244-9288
Integritas Wall Mount Charger - Quick Start Guide
www.gecriticalpower.com
www.gecriticalpower.com
© 2016 General Electric Company. All rights reserved.
© 2016 General Electric Company. All rights reserved.
Document 8600092587P r04 2019 May
+
LOAD1
Load TB
Behind
Battery TB
Top Feed
with 1 DC Load breaker
LOAD1
Screws
Battery TB
9

Advertisement

Table of Contents
loading

Table of Contents