Step 16
Parts needed - No. 15 QTY 1
No. 28 QTY 1
Fix the Roof cap (No. 15) to the
nial (No. 28) with 1x50mm screw
screwing up through into the nial.
Then x down through the roof
cap into the building with 2x30mm
screws as shown.
2x30mm Screws
1x50mm Screws
30mm
50mm
Pre drill
screw
screw
hole
28
15
Step 17
Parts needed - No. 7 QTY 1
No. 21 QTY 3
Fix the Slave Door (No. 7) to the
building.
Secure the T Hinges (No. 21) to the
Door with 3x30mm chrome screws
per hinge.
Then x the T hinges to the build-
ing with 4x30mm screws per
hinge.
18x30mm Chrome Screws
30mm
Pre drill
screw
hole
Step 18
Parts needed - No. 6 QTY 1
No. 21 QTY 3
Fix the Master Door (No. 6) to the
building.
Secure the T Hinges (No. 21) to the
Door with 3x30mm screws per
hinge.
Fix the T hinges to the building
with 4x30mm screws per hinge.
18x30mm Chrome Screws
30mm
Pre drill
screw
hole
7
21
6
21
P 8
Need help?
Do you have a question about the Clover 03CLOV0808-V1 and is the answer not in the manual?
Questions and answers