Download Print this page
Morningstar ProStar MPPT Series Quick Start Manual

Morningstar ProStar MPPT Series Quick Start Manual

Solar charging system controller
Hide thumbs Also See for ProStar MPPT Series:

Advertisement

Quick Links

Specifications:
PS‐MPPT‐25
Nominal Battery Voltage
12/24 V
Max. PV Open‐Circuit Voltage
120 V
Nominal Maximum Input Power
350 / 700 W
Maximum Battery Charging Current
25 A
Rated Load Current
25 A
Operational Configuration:
Switch 1: Load/Lighting
Mode
Switch 1
Normal
OFF
Lighting
ON
Lighting
Normal
Switches 4, 5, & 6: Battery Type Selection
NOTE:  The ProStar MPPT can be programmed to accommodate a wide range of charging parameters. 
Consult the battery manufacturer for optimal battery charging settings. 
To Change Settings:  
  • On metered models, use the interface on the meter or use the software available at https://www.morningstarcorp.com/msview/.  
  • On non‐metered models, use the software available at https://www.morningstarcorp.com/msview/.
See the ProStar Installation, Operations, and Maintenance Manual for additional information/guidance.
1 – Sealed *
2 – Sealed *
3 – Sealed *
DIP Switch 
Absorption 
Float 
Setting 
Battery Type 
Stage 
State 
(Volts) 
(Volts) 
OFF  OFF  OFF  1 – Sealed* 
14.00 
13.50 
OFF  OFF  ON  2 – Sealed* 
14.15 
13.50 
OFF  ON  OFF  3 – Sealed* 
14.30 
13.50 
OFF  ON 
ON  4 – AGM/Flooded* 
14.40 
13.50 
ON  OFF  OFF  5 – Flooded 
14.60 
13.50 
ON  OFF  ON  6 – Flooded 
14.70 
13.50 
ON 
ON  OFF  7 – L‐16 
15.40 
13.40 
ON 
ON 
ON  8 – Custom** 
Custom 
Custom 
*"Sealed" battery types include Gel and AGM Batteries 
**Lithium‐ion and some other battery types require custom programming.  Morningstar provides downloadable settings for selected battery 
manufacturers here:  https://www.morningstarcorp.com/energy‐storage‐partner‐program/ 
 
Shared Settings
Set Point
Absorption Extension Voltage
12.50 Volts 
Absorption Extension Time
Absorption Time +30 minutes
Float Exit Time‐Out
60 minutes
Switch 7: Battery Equalization
Mode
Switch 7
Manual Equalization
OFF
Auto‐Equalization
ON
Manual EQ
Contact Information:
Technical Support:  Support.morningstarcorp.com
Phone: 1‐
215‐321‐4457
4
Warning: Shock Hazard
PS‐MPPT‐40
Test between all terminals and 
12/24 V
ground before touching.
120 V
560 / 1120 W
Power or accessory terminals are NOT
40 A
electrically isolated from DC input and may
30 A
be energized with hazardous
solar voltage.  
Switches 2 & 3: System Voltage
System Voltage
Switch 2
Switch 3
Auto
OFF
OFF
12
OFF
ON
AUTO
24
ON
OFF
4 – AGM / 
5 – Flooded
6 – Flooded
7 – L‐16
Flooded *
Equalize 
Absorption 
Equalize 
Equalize 
Equalize 
Stage 
Time 
Time 
Timeout 
Interval 
(Volts) 
(Minutes) 
(Minutes) 
(Minutes) 
(days) 
‐‐‐ 
150 
‐‐‐ 
‐‐‐ 
‐‐‐ 
14.40 
150 
60 
120 
28 
14.60 
150 
60 
120 
28 
15.10 
180 
120 
180 
28 
15.30 
180 
120 
180 
28 
15.40 
180 
180 
240 
28 
16.00 
180 
180 
240 
14 
Custom 
Custom 
Custom 
Custom 
Custom 
Shared Settings
Set Point
Float Cancel Voltage
12.10 Volts
Equalize Time‐Out
Equalize Time +60 minutes
Temperature Compensation Co‐Efficient
–30 millivolts / °C / 12 Volts
Switch 8: Meterbus/MODBUS Settings
Mode
Switch 8
Meterbus
OFF
MODBUS
ON
Meterbus
Auto EQ
© 2020 Morningstar Corporation.  All Rights Reserved.
Today's Battery Voltage
Min 12.26 V
Max 12.84 V
12 V
24 V
Scan QR Code to go
directly to the
ProStar MPPT
Installation Manual
and warranty
information online.
Custom**
LVD 
LVR 
(Volts) 
Volts) 
In the box:
11.5 
12.6 
11.5 
12.6 
11.5 
12.6 
11.5 
12.6 
11.5 
12.6 
11.5 
12.6 
11.5 
12.6 
Custom 
Custom 
ProStar Charge Controller
Mounting 
Screws (x4)
Ferrite Chokes
*A Menu Map is also included with metered versions, 
MODBUS
Tools Required:
—  #2 Philips Screwdriver
—  3/16  (5 mm) & 3/32" (2.5 mm) Flathead Screwdriver
—  Drill with a 1/8" (3 mm) bit
MS‐001538 rev.B
Quick Start Guide
Safety Information:
Warning: Shock Hazard
The ProStar MPPT controller must be installed by a  
qualified technician in accordance with the electrical 
regulations of the country of installation.
Warning: Shock Hazard
This unit is not provided with a GFDI device.  This charge 
controller must be used with an external GFDI device as 
required by the Article 690 of the National Electrical Code 
for the installation location.
IMPORTANT:  READ the ProStar Installation Manual 
for safety and regulatory information, instructions on 
configuration and operation, and warranty information.
Warranty Registration: https://www.morningstarcorp.com/product‐registration/ 
Mounting Template
but is not shown in this guide.
Optional Accessories
Relay Driver (RD‐1)
Wire Box
Ethernet MeterBus 
Converter (EMC‐1)
Remote Meter (RM‐10)
PV Ground Fault Protection
Remote Temperature 
(GFPD‐150V and GFPD‐600V)
Sensor (RTS)
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the ProStar MPPT Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Morningstar ProStar MPPT Series

  • Page 1 240  14  11.5  12.6  Relay Driver (RD‐1) ON  ON  ON  8 – Custom**  Custom  Custom  Custom  Custom  Custom  Custom  Custom  Custom  Custom  Wire Box *“Sealed” battery types include Gel and AGM Batteries  **Lithium‐ion and some other battery types require custom programming.  Morningstar provides downloadable settings for selected battery  ProStar Charge Controller manufacturers here:  https://www.morningstarcorp.com/energy‐storage‐partner‐program/    Shared Settings Set Point Shared Settings Set Point Absorption Extension Voltage 12.50 Volts  Float Cancel Voltage 12.10 Volts Ethernet MeterBus  Converter (EMC‐1) Absorption Extension Time Absorption Time +30 minutes Equalize Time‐Out Equalize Time +60 minutes Float Exit Time‐Out 60 minutes Temperature Compensation Co‐Efficient...
  • Page 2 Quick Start Guide ProStar MPPT™ Charge Controller IMPORTANT:  Example only.  Actual wiring may vary.  READ the ProStar  Caution: Equipment Damage Photovoltaic (PV) Array Installation, Operations, and Maintenance Manual for mandatory safety  requirements.  All configuration must comply with local and national electric  Do not expose the ProStar CC  to weather.  Locate in  See the Morningstar PV String Calculator at: codes.  Consult your local electric authority to ensure compliance.   a dry, protected area to prevent equipment damage.   http://string‐calculator.morningstarcorp.com/ Ensure the minimum clearance requirements are  This illustration represents a typical off‐grid installation.  For use with an  followed to provide adequate ventilation and  inverter, refer to the inverter’s installation manual for additional information. 120 Voc Maximum prevent the unit from overheating. Optional Accessories 6" DIP Switch Block (enlarged) Relay Driver (See Page 4 for settings) 2" 2" RJ‐11 ...

This manual is also suitable for:

Ps-mppt-25Ps-mppt-40