Table of Contents GA350 V. 1.0 Table of Contents About this manual......................5 How to work with the manual ....................5 Record of changes......................5 Safety ..........................7 Intended use ........................7 Liability ..........................7 User qualification for installation ..................7 CE certification........................7 Safety symbols on the machine..................8 Safety symbols in the manual ...................8...
Page 4
Table of Contents GA350 V. 1.0 Installation ........................21 Unpack the machine .......................21 4.1.1 Remove the cardboard ..................21 4.1.2 Remove the plastic protection and foil..............21 4.1.3 Remove the transport brackets................22 4.1.4 Dispose of the packaging material..............22 Put the machine in position.....................22 4.2.1...
-install -operate -perform basic maintenance -correct small problems The GA350 and all its versions are referred to in the manual as the ’machine’. This manual contains the original instructions. The original language of the manual is English. How to work with the manual 1.
Safety GA350 V. 1.0 Safety WARNING Read the manual before you install or use the machine. Failure to do so can result in personal injury, death or property damage. Intended use The machine is designed to mix paint in a can. Any other use of the machine is strictly forbidden.
Safety GA350 V. 1.0 Safety symbols on the machine Read the manual. Electrical hazard. Read the manual. Central earthing point. Pinch hazard. Electrical hazard. Rotating parts. On-Off Safety symbols in the manual WARNING WARNING Can cause personal injury. Pinch hazard.
Safety GA350 V. 1.0 Disposal of the machine 1. Sort the machine, the accessories and the packaging for environmentally friendly recycling. 2. Do not dispose of the machine into domestic waste. Dispose of the machine according to local regulations.
Operator manual GA350 V. 1.0 Operator manual Description 3.1.1 Overview of the machine Door Can table Casing Drain orifice Control panel. See also § 3.1.2. Can plate (top) Emergency stop Type plate. See also § 3.1.4. Wheel Net entry Adjustable foot...
Operator manual GA350 V. 1.0 Operation WARNING Only push the emergency stop in the case of a safety emergency. CAUTION Make sure that the machine is empty or that a can is clamped. 3.2.1 Turning on the machine - if cradle is in correct position 1.
Operator manual GA350 V. 1.0 3.2.5 Placing the can Pull out the can table 1. Open the door. 2. Pull up the handle (A) to unlock the can table (B). 3. Pull out the can table until you hear a ‘click’. The can table is locked.
Page 15
Operator manual GA350 V. 1.0 If you mix one can: 1. Retain the can handle with an elastic band or self-adhesive tape. Push the can table 1. Pull up the handle (A) to unlock the can table. 2. Push the can table (B) inwards until you hear a ‘click’. The can table is locked.
Operator manual GA350 V. 1.0 3. Lift the handles and move the handles inwards. 4. Push the lock button to secure the handles. 5. Close the door. 3.2.6 Start the machine 1. Select the speed by pushing the SP1, SP2 or SP3 key. See §...
Operator manual GA350 V. 1.0 3.2.7 Remove the can 1. Open the door. 2. Turn the lock button counterclockwise to loosen the handles. 3. Move the handles upwards. 4. Use the handles to unclamp the can. 5. Pull up the handle (A) to unlock the can table (B).
Operator manual GA350 V. 1.0 3.2.9 Choose the mix speed Note You can choose the mix speed when the display shows ‘rdY’. Note While the machine operates, you can adjust the mix speed with the SP1, SP2 and SP3 keys. The machine shows the chosen speed every several seconds.
Operator manual GA350 V. 1.0 3.2.11 Adjust default mix time Note You can adjust the default mix time when the display shows ‘rdY’. 1. At the same time, push the Program key and the T1, T2 or T3 key. Hold for 2 seconds.
Operator manual GA350 V. 1.0 Remove spilled paint Do this procedure when paint is spilled inside the machine. 1. Make sure that the machine is stopped. See § 3.2.6 or § 3.2.8. 2. Put a reservoir (A) below the drain orifice (B).
Installation GA350 V. 1.0 Installation Unpack the machine 4.1.1 Remove the cardboard 1. Remove the tensioning straps (A). 2. Remove the cardboard (B). 4.1.2 Remove the plastic protection and foil 1. Remove the plastic foil (A).
Installation GA350 V. 1.0 4.1.3 Remove the transport brackets 1. Remove the screws (A). 13mm 2. Remove the transport brackets (B). 4.1.4 Dispose of the packaging material 1. Dispose of the packaging material in an environmentally friendly way, according to local regulations.
Installation GA350 V. 1.0 1. Push the machine to the final location. CAUTION Do not use a fork-lift truck. Note Make sure the final location is well-lit and well- ventilated. 2. Connect the power cable to the net entry. 3. Connect the power cable to the wall socket.
Troubleshooting GA350 V. 1.0 Troubleshooting General troubleshooting procedure 1. Try to solve the problem with the information in this manual. See § 5.3.1. 2. If it is not possible to solve the problem with the information in this manual, contact service. See § 5.2.
Technical data GA350 V. 1.0 Technical data General specifications Parameter Specification Materials used are suitable for Water, universal and solvent colorants Maximum load weight [kg] Can plate diameter [cm] Can plate bottom seating diameter [cm] Maximum can height [cm] Minimum can height [cm]...
Technical data GA350 V. 1.0 Noise level Parameter Specification Maximum noise level [dB(A)] <65 Safety classifications Parameter Specification Overvoltage category Class II IP (Ingress Protection) classification EMC (ElectroMagnetic Compliancy) classification Class B Electrical specifications Parameter Specification Power consumption, maximum [W]...
Need help?
Do you have a question about the GA350 and is the answer not in the manual?
Questions and answers