Chapter 4 Procedures Before Operation - Mitsubishi Electric MELSEC- iQ-R Series Startup User's Manual

Channel isolated analog-digital converter module
Hide thumbs Also See for MELSEC- iQ-R Series:
Table of Contents

Advertisement

4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Mounting a module
Mount the A/D converter module in any desired configuration.
Page 30 System configuration
2.
Wiring
Perform wiring of external devices to the A/D converter module.
Page 27 External Wiring
3.
Adding a module
Add the A/D converter module to a module configuration by using the engineering tool. For details, refer to the following.
 GX Works3 Operating Manual
4.
Parameter settings
Set up the parameters of the A/D converter module by using the engineering tool. For details, refer to the following.
 MELSEC iQ-R Channel Isolated Analog-Digital Converter Module (With Signal Conditioning Function) User's Manual
(Application)
5.
Offset/gain setting
Perform the offset/gain setting to set a user range, if necessary.
Page 39 OFFSET/GAIN SETTING
6.
Programming
Create a program. For details, refer to the following.
Page 30 OPERATION EXAMPLES
4 PROCEDURES BEFORE OPERATION
22

Advertisement

Table of Contents
loading

Table of Contents