3.15 Optional System Checkouts
This section describes the checks that must be completed in order to verify that optional systems are
correctly configured and connected to the G1000. The checks must be completed only for those systems
that are part of a particular installation. Optional systems are considered previously installed;
consequently, prior to (or concurrent with) the G1000 interface verification, additional system checks
may be required – refer to the appropriate system installation manual for additional details.
3.15.1 WX500 Stormscope (if installed)
1. Verify that you can select the STORMSCOPE map page on the MFD.
2. Verify that LIGHTNING FAILED is not displayed in yellow in the center of the display (in place
of the ownship symbol)
3. Using a Stormscope tester or equivalent, simulate lightning strikes on the map.
4. Open the STORM SCOPE circuit breaker on the avionics circuit breaker panel and verify that
LIGHTNING FAILED is displayed after several seconds.
5. Close the STORM SCOPE circuit breaker on the avionics circuit breaker panel and verify that
LIGHTNING FAILED is removed after several seconds.
G1000 V8.XX S/W Load and Post Install Checkout – Columbia 350/400
190-00577-04
Page 3-39
Revision 1
Need help?
Do you have a question about the G1000 and is the answer not in the manual?
Questions and answers