Page 2
1.4 Tools required Jigsaw to cut ventilation into the cupboard base. Drill and bits suited to the worksurface a. SmartTap™ 1 x 30mm core bit (or closest match) b. SmartTap™ with Drainer 1 x 150mm core bit (or closest match) 1.5 John Guest Fittings...
Page 3
Shown here with tap over adjacent cupboard for clarity. When installing the tap will sit above the equipment ———————————————————— ———————————--------————————— TYPICAL INSTALL - QUATREAU SMARTTAP™ WITH DRIP TRAY ———————————————————— ———————————--------————————— Shown here with tap over adjacent cupboard for clarity. When installing the tap...
Page 4
2.1.1 Quatreau SmartTap™ (faucet) FROM THE SMARTTAP™ IS NOT STRETCHED WHEN IT 2.1.2 Quatreau Boiler PLUGS INTO THE BACK LEFT 2.1.3 Quatreau Chiller / Chiller Carbonator SIDE OF THE BOILER. ———————————————————— Open and inspect the Quatreau THE QUATREAU SMARTTAP™ will come SmartTap™...
Page 5
AA airgap should be at edge of the tap base unit and least 6” below the worksurface to carefully place the SmartTap into the ensure a fall when it is connected to worksurface ensuring that the the VenturiT™ onto the SmartTap™...
Page 6
———————————————————— ———————————————————— #5 INSTALLING THE VENTILATION FOR #6 CONNECTING WATER SUPPLY THE CHILLER UNIT ———————————————————— ———————————————————— Ventilation will ensure your chiller Connect the John Guest 1/2” - 1/4” performs to its specification. Failure to reducer from the installation kit to the install this will void the warranty on this cold isolation valve module.
Page 7
45-60psi at all times. You TO THE CHILLER OR DAMAGE may need to add a pump to ensure the WILL OCCUR. optimum psi is supplied to the Quatreau This step is covered in the commissioning system. guide.
Page 8
IMPORTANT INFORMATION TECHNICAL DETAIL QUATREAU 553-B QUATREAU CS20 CHILLER CARBONATOR POWER REQUIREMENTS 1 x 15Amp socket 1 x 15Amp socket (RCD Protected) VOLTAGE 110V 110V WATTAGE Max consumption 1.5KW 200W Standby consumption START UP TIME 10 minutes 10 minutes 4Bar / 60psi...
Page 9
———————————————————— NOTE: Should tests for micro-organisms #1 SANITATION AND FILTER reveal high colony counts from the chiller, CHANGE PROCEDURE run this santisation application whenever required, at all service intervals and with To sterilize the boiler and chiller system every installation. For installers you may and change filter at service intervals use to choose to chlorinate Chillers before the following procedure.
Need help?
Do you have a question about the SmartTap and is the answer not in the manual?
Questions and answers