Advertisement

Quick Links

Page 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the R-1000 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Roma R-1000

  • Page 1 Page 1...
  • Page 2 INSTALLATION INSTRUCTIONS The R-1000 Command center includes four components: The keypad, temperature probe and the power unit. INSTALLATION OF THE POWER UNIT The power unit is equipped with brackets, allowing it to be attached onto a surface. Locate the power unit, in an upright position with the wires coming out of the bottom, as close to the steam unit as possible.
  • Page 3 Page 3...
  • Page 4 INTERCONNECTIONS Note: Power must remain off until all connections are completed. Keypad A cable is provided for the keypad and the power unit connections. Tightly insert one end of the cable onto the keypad as shown in figure 2.Connect the cable’s other end to the power unit as shown on the wiring diagram.
  • Page 5 OPERATING INSTRUCTIONS “Time Key” The “time” key serves two functions. 1) Pressing the “time” key activates your steam generator. This key will allow you to adjust the desired length of the steam bath in 5 minute increments. When the timer reaches 0 the system will automatically shut off. 2) The “time”...

Table of Contents

Save PDF