Download Print this page

Sealey AP2060 Instructions page 3

1.2 mtr with drawer & cupboard

Advertisement

5
STEP 5. Follow the diagram above to fit the internal shelf (8). Use
1 screw, washer and nut to attach it to the back panel and then
locate it in the side panel support slots
7
STEP 7. Turn the workstation upright and screw the legs onto the
worksurface brackets (10 attached in step 6).
.
6
STEP 6. Place the wooden work surface (9) upside down so that
the predrilled holes are visible, place the brackets (10) and drawer
slots (11) on the underside of the work surface and secure with
screws.
8
STEP 8. To make the drawer take parts 12, 13, 15, 16 and screw
them together as show in the diagram above, making sure that the
bottom lip of each panel is facing inwards. Then place the wooden
base inside of the shelf.
AP2060 - 1 - 010507

Advertisement

loading