GE Multilin G500 Instruction Manual page 21

Substation
Hide thumbs Also See for Multilin G500:
Table of Contents

Advertisement

CHAPTER 3: INSTALLING THE G500
G500 SUBSTATION GATEWAY INSTRUCTION MANUAL
3.
Attach the unit by aligning the two screws with the keyhole mounting points of the
brackets.
4.
Once aligned, set down the unit and then tighten the screws.
The recommended tool torque settings for zinc-plated mounting screws are:
10-32 UNF screws use 22.2 in-lb [2.50 Nm]
12-24 UNC screws use 31.0 in-lb [3.51 Nm]
M5x0.45 screws use 18.1 in-lb [2.04 Nm]
GE INFORMATION
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents