STEP 2 ..........................24 6.2.3 STEP 3 ..........................25 6.2.4 STEP 4 ..........................26 6.2.5 STEP 5 ..........................27 6.2.6 STEP 6 ..........................28 Instructions to assemble and install Edition E0 Page 2 of 69 Confidential and Property of CoeLux S.r.l.
Page 3
FIELD OF APPLICATION ....................... 63 9.2.3 TERMS AND DEFINITIONS ....................63 9.2.4 CASE STUDIES ........................64 10 CONTACTS..................69 11 COPYRIGHT ..................69 Instructions to assemble and install Edition E0 Page 3 of 69 Confidential and Property of CoeLux S.r.l.
COMMERCIAL NAMES CoeLux HE: this refers to the High End product family. 45 HC Systems: this refers to the CoeLux HE product sub-family, consisting of CoeLux® 45 HC, CoeLux 45 HC_P and CoeLux 45 HC_P_M. Instructions to assemble and install...
Capable of operating on live parts inside electrical cabinets and junction boxes. Qualified Technician or Technician qualified by CoeLux s.r.l. to carry out Operator operations of extraordinary maintenance, even under special conditions. He possesses mechanical and/or electrical and/or electronic skills, depending on the case.
(not all products), even in a completely closed space. They consist of a LED light source, glass optical components and a CoeLux® plastic plate, all housed in a single, metal structure.
Page 7
(Tab. 3). They can also be installed on surfaces which are normally inflammable. For all technical lighting data, please refer to the product technical sheet. Contact CoeLux S.r.l to receive it directly or to receive further product details and clarifications.
CoeLux S.r.l. will not be held liable for the incorrect installation and/or assembly or which does not comply with what is described in the installation manual.
Proceed to carry out a careful, scrupulous, general check to identify any damage to the unit during transport. All damage must be immediately notified in writing to the haulier and the manufacturer. Do not continue to unpack until you are authorised to do so by CoeLux S.r.l. Proceed to assemble as indicated in Chapter 4.
With bits for 13 mm clutch worker. nuts and 10 mm screws (Phillips). Suction cups to handle the mirrors. Vacuum cleaner Electrical plug and socket adapters Instructions to assemble and install Edition E0 Page 12 of 69 Confidential and Property of CoeLux S.r.l.
Page 13
20 cm long Fixed, tube, 1 set. Specifically 10 scaffolders spanner and 13 mm. Allen keys. 1 set. Specifically 4 and 5 mm. Instructions to assemble and install Edition E0 Page 13 of 69 Confidential and Property of CoeLux S.r.l.
Page 14
Anti-mould acrylic transparent silicone silicone cartridge Electric extension At least 1 Triple-pole, 25 m-long cable Insulation tape At least 1 Black Battery torch Instructions to assemble and install Edition E0 Page 14 of 69 Confidential and Property of CoeLux S.r.l.
Page 15
Please read Chapter 7 ASSEMBLY. Lifting device, suitable Lift trolley for the work load (300 kg). Hoist Tab. 4 Tools required, but not supplied Instructions to assemble and install Edition E0 Page 15 of 69 Confidential and Property of CoeLux S.r.l.
4.2. CAUTION: If you do not use the CoeLux installation kit, the installer will be responsible for the structural certification of the suspension system. CoeLux S.r.l. declines any liability for the use of any alternative suspension system to the one offered.
CoeLux declines any responsibility for any breach of the instructions and warnings listed here. The installation kit supplied by CoeLux S.r.l. consists of: 4 L-plates to fasten to the ceiling via 2 anchor points (PN 73-00153-01) 4 M12 1500 mm threaded bars.
Page 18
M12 bar (adjustable) with 11 mm [73-00156-01] fastening hole [73-00156-01] Fig. 4 Recommended anchor system - Fastening of L-shaped profiles and threaded bars Instructions to assemble and install Edition E0 Page 18 of 69 Confidential and Property of CoeLux S.r.l.
It is of fundamental importance during the assembly phase to take great care to avoid contaminating each component. Dust deposits on internal surfaces, dirt on the CoeLux® panel or on the optical parts, for example, could prevent the product from performing at its best. Regular cleaning is essential to maintain the performance of the equipment (please read paragraph 7 MAINTENANCE).
Page 20
CAUTION: Incorrect cleaning could cause irreparable scratches on the optical surfaces. If the surface is damaged, stop installation and contact CoeLux S.r.l to request a new replacement part. When assembly is complete, any visible dirt must be removed from all the internal, metal parts, from the optical outlet and from the ventilation holes of the LED projector.
ASSEMBLY WARNING! Only CoeLux S.r.l. qualified personnel can assemble the system. The 45 HC systems must be assembled according to the instructions given in Chapter 5 INITIAL CLEANING. The following figure shows an exploded diagram of the structure of the 45 HC systems and gives the names of the main parts.
CoeLux® panel must be opened only when they have to be assembled: the mirrors in Step 10 and 11, and the CoeLux® panel in Step 3. The folded part of the metal sheets must always lie outside the box.
(approximately 45 cm) while it is being assembled to facilitate assembly operations. The picture below shows an example of a support structure which CoeLux S.r.l. can supply on request. It also gives the optimum distances to support the entire assembled equipment, even though during assembly these supports have to be moved gradually beneath the box.
STEP 2 Use the screws and M8 nuts supplied (for this size of bolts we advise using a 20 Nm tightening torque) to assemble the lower panels [1] (CoeLux® PN 73-00001-01), [2] (PN 73-00002-01), [3] (PN 73-00003-01) and [4] (PN 73-00004-01).
Figure 6. Take care the transparent strip of silicone on the CoeLux® panel is invisible. Then, place the CoeLux® panel [6] (PN 03-00001-01) on the edge with the silicone, so it is sealed and place the two pieces assembled in a dust-free area (even outside the clean chamber, but covered with a polyethylene sheet and ensuring it remains untouched) for at least two hours to allow the silicone to dry.
[14] (PN 73-00014-01) and fasten it on to the vertical panels ([8], [9]), and to the large, upper panel [13] (PN 73-00013-01). Fig. 13 Installation sequence - Step 5 Fig. 14 Installation sequence - Step 5 Instructions to assemble and install Edition E0 Page 27 of 69 Confidential and Property of CoeLux S.r.l.
The folded edges [16A] of the vertical divider [16] (PN 73-00016-01) must be inserted inside the already assembled panels, i.e. towards the CoeLux® panel aperture. Check the lip seals [18] (PN 36-00001-01) are present on both sides facing upwards. Use the screws and M8 nuts supplied to assemble the lower panel [17] (PN 73-00017-01) and fasten it on to the other lower panel [4].
Page 29
Fig. 16 Installation sequence - Step 6 Instructions to assemble and install Edition E0 Page 29 of 69 Confidential and Property of CoeLux S.r.l.
([17], [20]). Take great care not to damage the strips of pre-stressed steel wire on the edge of the window. The folded edges of the vertical divider [23] (PN 73-00023- 01) must be inserted inside the already assembled panels, i.e. towards the CoeLux® panel aperture.
00024-01) and fasten it on to the two vertical panels [25] (PN 73-00025-01) and to the upper horizontal panel [20]. Fig. 21 Installation sequence - Step 9 Fig. 22 Installation sequence - Step 9 Instructions to assemble and install Edition E0 Page 32 of 69 Confidential and Property of CoeLux S.r.l.
Analyse the surface and proceed as shown in Figure 23. The detailed procedure is described in paragraph 10.2. Fig. 23 Flow chart procedure, analysis and extraordinary cleaning of the mirrors Instructions to assemble and install Edition E0 Page 33 of 69 Confidential and Property of CoeLux S.r.l.
Page 34
Check the mirror is stable and does not rotate vertically. Fig. 25 Installation sequence - Step 10 Fig. 26 Installation sequence - Step 10 Instructions to assemble and install Edition E0 Page 34 of 69 Confidential and Property of CoeLux S.r.l.
Once you have assembled the mirror, place the foam mat supplied to protect the mirror into position and take care not to drop anything on top of it. Instructions to assemble and install Edition E0 Page 35 of 69 Confidential and Property of CoeLux S.r.l.
Page 36
22 bis Fig. 28 Installation sequence - Step 11 Fig. 29 Installation sequence - Step 11 Instructions to assemble and install Edition E0 Page 36 of 69 Confidential and Property of CoeLux S.r.l.
[37] (PN 73-00037-01). Wait for step 15 before assembling the lid [41] (PN 73-00041-01). Fig. 30 Installation sequence - Step 12 Fig. 31 Installation sequence - Step 12 Instructions to assemble and install Edition E0 Page 37 of 69 Confidential and Property of CoeLux S.r.l.
If necessary, disassemble the problematic part and correct the problem. Fig. 32 Installation sequence - Step 13 Fig. 33 Installation sequence - Step 13 Instructions to assemble and install Edition E0 Page 38 of 69 Confidential and Property of CoeLux S.r.l.
Fig. 34 Installation sequence - Step 14A Fig. 35 Installation sequence - Step 14A Instructions to assemble and install Edition E0 Page 39 of 69 Confidential and Property of CoeLux S.r.l.
Page 40
[47] (PN 36-00026-01) on the 4 threads with nuts. Install this sub-group on to the rest of the apparatus. Fig. 36 Installation of the ventilation kit Instructions to assemble and install Edition E0 Page 40 of 69 Confidential and Property of CoeLux S.r.l.
Page 41
(using outlet valves) in order to enable the air to circulate with the room. Fig. 38 Installation of the ventilation kit Instructions to assemble and install Edition E0 Page 41 of 69 Confidential and Property of CoeLux S.r.l.
Page 42
6.2.14.3 Mains supply connections The user is responsible for preparing the mains power supply cable between the distribution network and the unit, and only CoeLux S.r.l. qualified technicians can connect them. WARNING! Before you commence the electrical connections, you must check that the supply cables and any other cable intended to be connected to the unit terminals are not live.
Page 43
Fig. 40 Cable gland installation diagram Screw terminals Rubber cable gland Screw cable gland Fig. 41 Branching terminal board to connect the mains supply cables Instructions to assemble and install Edition E0 Page 43 of 69 Confidential and Property of CoeLux S.r.l.
Page 44
Junction Fig. 42 Sketch to show an example of the terminal board supplied Fig. 43 Completed electrical connections to the projector 74-00013-01 Instructions to assemble and install Edition E0 Page 44 of 69 Confidential and Property of CoeLux S.r.l.
N.B.: while you fasten the projector to the rest of the system, the three grey connection boxes remain on your left (Figure 45). Fig. 44 Installation sequence - Step 14B Fig. 45 Installation sequence - Step 14B Instructions to assemble and install Edition E0 Page 45 of 69 Confidential and Property of CoeLux S.r.l.
Page 46
N.B.: while you fasten the projector to the rest of the system, the three grey connection boxes remain on your left (Figure 45). Fig. 46 Installation sequence - Step 14B, OPTION 2 Instructions to assemble and install Edition E0 Page 46 of 69 Confidential and Property of CoeLux S.r.l.
Page 47
6.2.15.1 Mains supply connections and DALI for the projector 74-00062-01 / 74-00063-01 The user is responsible for preparing the mains power supply cable between the distribution network and the unit, and only CoeLux S.r.l. qualified technicians can connect them. WARNING! Before you commence the electrical connections, you must check the supply cables and any other cable intended to be connected to the unit terminals are not live.
(assembled in step 12). Now, close the door [41]. Fig. 49 Insertion and replacement of silica gel - Step 15 Instructions to assemble and install Edition E0 Page 48 of 69 Confidential and Property of CoeLux S.r.l.
Raise the equipment approximately 180 cm from the ground. Take the sub-group assembled in Step 3, remove the film from the top of the CoeLux® panel [6] and clean the surface in two stages: Stage 1 (wet): wet the entire surface thoroughly with a cotton cloth and the dust collector (both supplied in the cleaning kit).
Page 50
Use the screws and M8 nuts supplied to assemble the sub-group on to the lower panels ([1], ([2], [3], [4]) with the frame [5]. You must assemble from underneath. Therefore, remove the protective film from the bottom part of the CoeLux® panel [6] and clean it as shown in the appropriate section of the Chapter Initial Cleaning.
M12 nut (8.8) 50x5 Horizontal steel tie rod [73-00155-01] Fig. 54 Anchor system: fastening plates on the dark-box Instructions to assemble and install Edition E0 Page 51 of 69 Confidential and Property of CoeLux S.r.l.
Page 52
See Figure 54 Fig. 55 Recommended anchor system Instructions to assemble and install Edition E0 Page 52 of 69 Confidential and Property of CoeLux S.r.l.
/h), the apertures E in the false ceiling must guarantee the minimum air flow required to cool the projector and must have a minimum diameter of 150 mm (the false ceiling vents are NOT supplied by CoeLux S.r.l.). Air inlet piping Air outlet piping Fig.
Switch on the unit and visually check: the CoeLux® panel is in the correct horizontal position; for any objects, scratches, ring marks or dirt on the CoeLux® panel both inside and outside the box; for any scratches, ring marks, spots on the internal walls of the box and on the mirrors.
(paragraph 6.2.15.1). Some DALI parameters have been preset on the projectors: To avoid any discomfort, CoeLux recommends setting the fade-time for the change in intensity to over 2 sec. In the event of installations of HC and LC systems side by side in the same room, in order to obtain a similar light from the sky and beam projected to the ground we recommend you configure the intensity of switch on and/or of the same DALI scenario as follows: LC systems 70%, HC systems 85%.
To connect to the projector, follow the instructions given inside the controller packaging and those regarding the DALI connection in paragraph 6.2.15.1 in this manual. Fig. 58 Controller supplied with the product: front part Instructions to assemble and install Edition E0 Page 56 of 69 Confidential and Property of CoeLux S.r.l.
If this proves impossible, a warning sign must be placed very clearly on the control device. CoeLux declines any responsibility for any breach of the instructions and warnings listed here. DISMANTLING THE SYSTEM If you dismantle the system, you must follow all the instructions and warnings given for the installation phase.
Figure 59 shows some possible configurations to install CoeLux® 45 HC at an angle. The side of the projector is on the left in each picture.
Page 59
CoeLux does NOT supply this suspension system. CAUTION: If you do not use the CoeLux suspension kit, the installer will be responsible for the structural certification of the new suspension system. CoeLux S.r.l. declines any liability for the use of any alternative suspension system to the one offered.
Page 60
- elements T4 and T5: 100x100x6 angle profiles (x4 and x2) VAR. VAR. Hole ɸ 12 Holes ɸ 12 Holes ɸ 12 Fig. 62 Elements T1, T2, T3, T4 and T5 Instructions to assemble and install Edition E0 Page 60 of 69 Confidential and Property of CoeLux S.r.l.
Page 61
LIST OF BOLTS AND PLUGS - M8 bolt (8.8) (x8) - M10 bolt (8.8) (x10) Min. 35 mm Min. 30 mm Fig. 64 M8 and M10 Bolts Instructions to assemble and install Edition E0 Page 61 of 69 Confidential and Property of CoeLux S.r.l.
Page 62
Element P1 Element A3 Element P1 Element A1a Layout Element A3 Element A1b Layout Element A1a Element A3 Fig. 65 Chassis layout and elevations Instructions to assemble and install Edition E0 Page 62 of 69 Confidential and Property of CoeLux S.r.l.
This procedure describes the extraordinary cleaning of the mirrors during installation. This procedure is based on and supplements the preceding instructions. - This procedure can be carried out only by CoeLux S.r.l. authorised installers. For this procedure to be effective, the operator is required to attend an adequate training course to acquire the skills needed to identify the defects mentioned in the procedure and to implement the work described.
CASE STUDIES The mirror must have already undergone the standard cleaning process during production and must be marked with the CoeLux quality control pass stamp (Figure 66). Fig. 66 CoeLux Quality Control Stamp Three different cases have been identified according to the type and quantity of ring marks, impurities and/or particulate matter, which may be found on the surface of the mirrors when the boxes are opened, each of which will be treated differently.
Page 65
Fig. 67 Case A Fig. 68 Case B Instructions to assemble and install Edition E0 Page 65 of 69 Confidential and Property of CoeLux S.r.l.
Page 66
(you can switch on the projector and point it at the mirror to check it better). Frequently change the cloth during this operation. Fig. 69 Case C Instructions to assemble and install Edition E0 Page 66 of 69 Confidential and Property of CoeLux S.r.l.
Page 67
Ring marks: more or less opaque Case B areas on the glass (if they do not surface due to disappear Case various types of dirt Instructions to assemble and install Edition E0 Page 67 of 69 Confidential and Property of CoeLux S.r.l.
Page 68
Bands: visible only with the help of the ACCEPTABLE projector Instructions to assemble and install Edition E0 Page 68 of 69 Confidential and Property of CoeLux S.r.l.
This manual is published by CoeLux S.r.l. All rights, including the translation, are reserved. No reproduction of any kind is permitted without the written permission of CoeLux. Partial reproduction and/or a summary is also prohibited. This manual reproduces the technical status at the time of printing. The company reserves the right to modify not only the text, images and data contained herein, but also in terms of technology, equipment or update of the legislative requisites.
This manual is also suitable for:
45 hc p m series45 hc45 hc p ce45 hc p ul45 hc p m ul
Need help?
Do you have a question about the 45 HC P Series and is the answer not in the manual?
Questions and answers