Checking The Drainage - Panasonic CZ-24KPU1U Series Installation Instructions Manual

Single split system air conditioner
Hide thumbs Also See for CZ-24KPU1U Series:
Table of Contents

Advertisement

3-5. Checking the Drainage

After wiring and piping are completed, use the follow-
ing procedure to check that the water will drain smooth-
ly. For this, prepare a bucket and wiping cloth to catch
and wipe up spilled water.
WARNING
(1) Take off the tube cover and through the opening,
slowly pour about 0.3 gal of water into the drain
pan to check drainage.
(2) Do Test Run to check the drainage after complet-
ing installation. When performing Test Run, refer to
the installation instructions attached to the outdoor
unit.
CAUTION
(3) After drain checking is finished, return the Opera-
tion Selector switch to the RUN position (ON posi-
tion ) and remount the tube cover.
WARNING
Panasonic̲PAC-i̲IndoorUnit̲US-le16   16
Panasonic̲PAC-i̲IndoorUnit̲US-le16   16
Do not supply power to the
unit until the tubing and wir-
ing to the outdoor unit are
completed.
Be careful since the fan will
start turning when checking
the drainage.
To mount the tube cover,
use 5/16" (4 × 8 mm) tap-
ping screws. Do not use long
screws as they may puncture
the drain pan and cause water
leakage.
Fig. 3-12
16
5/16"(4 × 8 mm)
tapping screw
Tube cover
Siphon
2011/11/02   15:17:16
2011/11/02   15:17:16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents