Unpacking The Pressure Myograph System - DMT MYOGRAPH SYSTEM 112PP User Manual

Table of Contents

Advertisement

UNPACKING THE PRESSURE MYOGRAPH SYSTEM

Please take a few minutes to carefully inspect your new Pressure Myograph System for damage, which
may have occurred during handling and shipping. If you suspect any kind of damage, please contact
us immediately and the matter will be pursued as soon as possible. If the packing material appears
damaged, please retain it until a possible claim has been settled.
We recommend that you store the packing material for any possible future transport of the Pressure
Myograph System. In case of transport, and the original packing material is unavailable, please contact
the DMT Sales Department for advice and packing instructions. After unpacking your new Pressure
Myograph System, please use the following list to check that the system is complete:
Pressure Interface
Pressure Interface-to-chamber cable with a temperature probe
Power adapter (the shape of the AC plug varies by country; be sure that the plug has the right shape
for your location)
USB cables for PC connection.
Atlas Copco Cablair hose for main pressure supply
Two 500ml Schott Duran Bottles with specially designed screw caps
Pressure Myograph (114P or 112PP)
Force calibration kit (including "bridge", "balance" and 2-gram weight)
Resistance tube shunt (calibration tube)
Two glass cannulas
Chamber cover
Riester "Big Ben" Pressure Manometer Peristaltic pump for superfusion flow (optional):
Watson Marlow peristaltic pump
FlowMeter – 162FM (optional)
MyoFlow™ FlowMeter software including drivers (CD-ROM)
User manual "FlowMeter – 162FM"
Microscope (optional)
DMT inverted Microscope, Inverted Zeiss, Olympus, Nikon or Motic etc.
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MYOGRAPH SYSTEM 112PP and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Myograph system 114p

Table of Contents