Installation Procedure
1. Remove all packing material from bin.
2. Remove all tape and temporary fastenings from door
assemblies and outside of bin.
3. Remove top from bin.
4. Remove set of four legs and any other accessories
packed inside bin.
5. Lay bin on back, being careful to protect finish, and
remove bolts holding skid to bin.
6. Screw legs into tapped holes in bin bottom and tighten
to seat legs well against bottom.
7. Set bin upright.
8. Reinstall top onto bin.
9. Remove protective paper from stainless steel exterior.
10. Move bin to permanent location.
11. Adjust "foot" at bottom of each leg to level bin in both
directions.
12. Mount ice machine(s) on bin in accordance with ice
machine instructions.
13. Connect drain line to 1" FPT female fitting located in
bottom of bin.
14. Make final connections to ice machine.
Part Number: 000006528 12/15
Section 2
Installation Instructions
Drain Requirements
• Bin drain termination must have an air gap.
• Drain lines must have a 1.5 inch drop per 5 feet of run
• The floor drain must be large enough to accommodate
• Run separate bin and ice machine drain lines and
(2.5 cm per meter), and must not create traps.
drainage from all drains.
insulate to prevent condensation.