Advertisement

GB
PRE-INSTALLATION CARD ART. 122W - 122R
Right-side Model
C
- Hot water connection for
F
- Cold water connection for tap fittings
O
- Connection for drainage pipe recessed in floor
CA - Electrical connection for sauna IPX4
(box with cable press PG 13.5)
The electrical installation must comply with the safety regulations for bathroom installation, as
described in the enclosed user's manual.
ART. 122W - 122R
Net
Delivery
Delivery
Weight
Weight
Volume
Kg.
Kg.
m
3
123
155
2,24
(1) - Before connecting the appliance, make sure that the voltage indicated on the rating plate is the same as that of the electric mains.
The information and characteristics shown do not bind Teuco Guzzini Spa who reserves the right to make any modifications it retains necessary without any prior warning or notice of replacement.
18
1
2 "
tap fittings
N.B. Installation must take place once floors and
/
walls are completed.
1
/
2 "
1
2 "
The room in which the sauna is to be installed
1
/
should be at least 230 cm for the model that can be
inspected at this height) .
HYDRAULIC CHARACTERISTICS
Multifunctions
Vertical
Back
Central
Foot
Capacity
Showerh.
Jets
jets
jets
6
3
2
1
9 ÷ 16
(mm 1010 x 810)
Left-side Model
Sauna
Supply
Pressure
Pressure
l/
Min. Max
Min. Max
min
2 ÷ 5
0.5 ÷ 5
1/2"
bar
bar
Measurements in mm.
Siphon
ELECTRICAL
CHARACTERISTICS
Sauna and Multifunctions
Drain
Conn.
Art.
2MEX18
1
1/2"
2NEX18
O
(1)
Kw
Min. Max
1,9 ÷ 2,3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 122W and is the answer not in the manual?

Questions and answers

Summary of Contents for Teuco 122W

  • Page 1 (1) - Before connecting the appliance, make sure that the voltage indicated on the rating plate is the same as that of the electric mains. The information and characteristics shown do not bind Teuco Guzzini Spa who reserves the right to make any modifications it retains necessary without any prior warning or notice of replacement.
  • Page 2 ASSEMBLING THE CABIN All screws and accessories which are necessary for installation are in the appropriate box Bag (A) with screws for steps 1 - 3 - 3a - 3b FIXING THE UNIT TO THE WALL Drill the appropriate hole for fixing the unit to the wall using the measurements indicated in the diagram and then fasten the...
  • Page 3 ASSEMBLING THE CABIN ASSEMBLING THE BACK PANELS Place drain cover on the drain in the shower base. Move the shower base away from the corner in order to proceed with the subsequent assembly steps. Remove the screws (C1) from the end of the bottom track.
  • Page 4 ASSEMBLING THE CABIN Fasten the panels (A) and (B) to- gether with the screws, nuts and washers (C3). Tighten the screws (C1) which have already been inserted into the shower base. Consult the attached manual for in- structions on how to install the Ø5 taps.
  • Page 5 ASSEMBLING THE CABIN INSTALLING TRACK Remove the screws from the ends of the top track. Insert the track onto the ends of the supports and fasten it to the 4,2x60 back panels using the screws and Ø5 washers (C) that were removed ear- 4,2x60 lier.
  • Page 6 ASSEMBLING THE CABIN MOUNTING THE DOOR Assemble the handles onto the door supports, using the screws provided (C3). Insert the track cover (V) and the finish end pieces (Y) into the top and bottom tracks. Turn the nut (D) until it is flush with the top of the (C) screw.
  • Page 7 CONNECTIONS FOR VARIOUS MODELS Art. 122R (EASY) - Easy Multifunction Shower Box with 2 Climates Steam Sauna Blue Yellow-Green Brown Once the plugs (D) have been A6 - Connection for hose 3 (drainage). removed, they should not be used N.B.: Hoses 1 and 2 for the again.
  • Page 8 CONNECTIONS FOR VARIOUS MODELS ONLY FOR ARTICLES 122 STEAM - 122 EASY EQUIPOTENTIAL EARTHING CONNECTION Connect the metal parts of the ca- bin with the yellow wire as indica- ted in the diagram. There is a terminal at point (7) for the equipotential connection of the other grounds present in the room.
  • Page 9 ASSEMBLING THE CABIN USING THE SHOWER FOR THE FIRST TIME Once all of the connections are made and before fastening the ca- bin to the wall, remove all of the adhesive tags. Run the regeneration and a sauna cycle, following the instructions contained in the attached user’s manual.
  • Page 10 ASSEMBLING THE CABIN M5x20 M5-Ø5 M5x20 M5-Ø5 Ø5 M5x16 Ø5 Ø5-M5 4,2x38 Ø5 Bag (B) - screws for step 13 FIXING THE SHOWER TO THE WALL Position the shower cabin against Remove the spacer and center the Fit the side panel by sliding it the wall.

This manual is also suitable for:

122r

Table of Contents

Save PDF