Switch Box, Switch Box Timer, Switch Box Timer + Pump Guard PROFESSIONAL INSTALLERS VERSION WARNING: Ensure that your Matsuko Switch Box is switched off at the mains before you attempt to conduct any type of maintenance on the Matsuko Switch Box.
• The unit must not be submerged in water. IN THE EVENT OF A POWER FAILURE • Following a power failure, the Switch Box will restart with each line in the same position as before the power interruption. The Switch Box Timer will resume as per its programming.
Page 3
9-1 1 INTRODUCING THE MATSUKO SWITCH BOX RANGE Congratulations on purchasing your Matsuko Switch Box. All Matsuko Switch Boxes are built to complement your outdoor enjoyment giving you total control of your lifestyle. All Matsuko Switch Boxes are designed to be weatherproof, stylish, robust and safe in your outdoor environment.
Page 4
** A double layer capacitor stores electrical energy to remember your programs in case of a power cut for at least 24 hrs when fully charged. The Matsuko double layer capacitors need minimum 48 hours to be fully charged. Page 4...
INSTALLATION (PLEASE SEE SEPARATE SHEET FOR WALL MOUNT INSTRUCTIONS) WARNING: ALWAYS TURN THE SWITCH BOX POWER OFF AT THE MAINS ELECTRIC BEFORE OPENING THE COVER. ALWAYS SECURE WITH CLOSING SCREW. OPENING THE COVER To open the cover insert a small...
Power input is supplied into a separate mains channel (14). Use two screws to secure the cable grip and fix each cable into place inside the Switch Box (16). Outside the Switch Box, if using the supplied cable gland sealing ring, ensure the cable gland sealing ring is turned clockwise until the cable is firmly secured and sealed in the connector (15).
Page 7
Once you have connected all of your appliances, always secure the lid with the closing screw. There are two blanking plugs supplied with Matsuko Switch Boxes. These blanking plugs should be used to replace the cable glands if you decide not to wire a device in at any point.
Page 8
ACTIVATING CONNECTED APPLIANCES (SWITCH BOX ONLY) To activate each appliance, simply press the corresponding on / off button on the front of the Switch Box, labelled: For more detailed programming instructions (for the Switch Box Timer) see page 10. TYPICAL EXAMPLE OF A COMPLETE INSTALLATION...
Page 9
The screen will display a large TICK to confirm that program slot changes have been recorded. When a line switches on, the light on the Switch Box will illuminate to show the line is on. Page 9...
Page 10
Line 1 on every Matsuko Switch Box Timer + PG is set to automatically learn how the new pump behaves when it is first connected and turned on through the timer.
Page 11
PROGRAMMING (SWITCH BOX TIMER, AND TIMER + PG) TO EDIT OR DELETE A PROGRAM SLOT Press Menu to enter the programming menu. Select the line you want to change using Up and Down . Press Enter . If required, use Up and Down to change the name of the device and press Enter .
Page 13
THE COVER. ALWAYS SECURE WITH CLOSING SCREW. Place the box against the wall to ensure that the wall surface is The Switch Box must be mounted level with the long hinge at flat. Use the paper template (below) to mark out the position of the top.