Download Print this page

Rowlinson Garden Products SS172B Assembly Instructions

1.8 x 1.2 (6’ x 4’) shiplap modular shed

Advertisement

Quick Links

Before assembly
We recommend that time is taken to read the
instructions before starting assembly, then
follow the easy step by step guide.
The instruction sheet is only a guide to
the assembly. Certain items may not be
shown to scale.
Check all components prior to assembly
This product should be assembled by no
less than two people.
Never attempt to erect the assembly in
high winds.
Drill components where indicated.
x 2
Drill
Recommended tools for assembly
Cross head screw driver
Hammer
Sharp knife
Drill
4mm diameter drill bit
Spirit level
Silicon sealant
Step ladder
RECOMMENDED BASE AREA
A recommended base area of no less
than 1275mm x 1870mm
No.
Components
1
Floor panel
2
Short floor bearer
(29 x 29 x 1174mm)
3
Long floor bearer
(29 x 29 x 1710mm)
4
Large plain panel
5
Window panel
6
Small plain panel
7
Right front panel
8
Left front panel
9
Apex panel
10 Door header rail
(28 x 28 x 647mm)
11 Roof purlin
(28 x 28 x 1770mm)
12 Large roof panel
13 Small roof panel
14 Felt batten
(28 x 28 x 1800mm)
15 Coverstrips
16 Door
17 Roof felt
(4m)
18 Window perspex
(610 x 560mm)
19 Window Beading
(9 x 9 x 615mm)
20 Window Beading
(9 x 9 x 550mm)
21 Bargeboards
No.
Fixing kit
22 Finials
23 T-hinges
24 Turn button
25 Hasp and staple
26 50mm screws
27 38mm screws
28 32mm screws
29 19mm round head screws
30 65mm nails
31 30mm nails
32 20mm nails
33 10mm felt nails
1.8 x 1.2 (6' x 4')
Shiplap Modular Shed
Assembly Instructions
Qty.
1
2
5
2
11
1
2
1
1
2
12
1
2
2
2
2
6
1
1
1
1
20
2
4
Qty.
2
3
1
1
28
24
22
8
7
10
104
9
80
13
14
19
25
24
18
1
10
2
16
7
English SS172B
22
21
17
23
3
5
6
9
4
15

Advertisement

loading
Need help?

Need help?

Do you have a question about the SS172B and is the answer not in the manual?

Questions and answers

Summary of Contents for Rowlinson Garden Products SS172B

  • Page 1 1.8 x 1.2 (6’ x 4’) English SS172B Shiplap Modular Shed Assembly Instructions Before assembly • We recommend that time is taken to read the instructions before starting assembly, then follow the easy step by step guide. The instruction sheet is only a guide to the assembly.
  • Page 2 1. Laying the floor section Prepare a level area for the shed to sit. To the bottom of the floor panels, attach the short floor bearers flush with the short edge of the floor using 5 x 30mm nails, nail through the floor panel into the bearers.
  • Page 3 5. Roof Insert the two roof purlins into the rebates in the apex sections as shown. Fix in place at the ends of the purlins, using 2 x 50mm screws per purlin. Screw through the purlin into the frame of the apex panels. It is recommended to drill pilot holes with a 4mm drill for each screw.
  • Page 4 ROWLINSON GARDEN PRODUCTS LIMITED components shown and are only correct at time of Green Lane printing. We reserve the right to change the Wardle Nr.Nantwich specification of our products without prior notice. Cheshire 2008 © Rowlinson Garden Products Ltd CW5 6BN...