Charging The Battery; Setting The Engine Speed - Toro 320-D Operator's Manual

Compact tool carrier
Hide thumbs Also See for 320-D:
Table of Contents

Advertisement

3

Charging the Battery

Parts needed for this procedure:
1
Battery (sold separately)
Procedure
Charge and install the battery; refer to
Battery (page
34).
4

Setting the Engine Speed

CE Machines Only
Parts needed for this procedure:
1
Aluminum tube
Procedure
If you are setting up this machine for use in the
European Community (CE), you must permanently
adjust the engine speed so that it is no more than
3,200 rpm, as follows:
1.
Start the engine and run it at half throttle for 5 to
10 minutes to warm it up.
Important:
The engine must be warm before
making this adjustment.
2.
Move the throttle to the F
3.
Using a tachometer and the throttle-adjustment
screw on the engine
speed to 3,200 rpm maximum, then tighten the
jam nut on the adjusting screw.
Important:
If the engine speed exceeds
3,200 rpm, the engine is not in compliance
with CE regulations and cannot be legally
sold or used in the European Community.
Charging the
position.
AST
(Figure
4), set the engine
1. Throttle-adjustment screw
4.
Shut off the engine.
5.
Slide an aluminum tube over the
throttle-adjustment screw and jam nut
(Figure
4) and crimp it down over the screw so
that the screw cannot be adjusted again.
Important:
The tube must be fully over the
jam nut to prevent access to it.
6.
Close the rear-access cover and secure it with
the lanyard fastener.
10
Figure 4
2. Aluminum tube
g016711

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

22337cp

Table of Contents