SORINEX OFF-GRID RACK Install Instructions

SORINEX OFF-GRID RACK Install Instructions

Advertisement

OFF-GRID RACK INSTALL INSTRUCTIONS
Your rack will arrive in 2 individually wrapped packages. Carefully remove protective wrapping. This is a 2 person installation.
EACH UPRIGHT MUST BE BOLTED TO THE WALL. EACH UPRIGHT MUST BE BOLTED TO THE GROUND. ALL NECESSARY
HARDWARE IS NOT INCLUDED.

HARDWARE / MATERIALS REQUIRED (NOT INCLUDED)

(12) 3/8" Lag Screws with Washers
(3) 2x6" (or larger) Wood Support Boards
General Wood Screws
(2) 1/2" Concrete Anchor

TOOLS REQUIRED (NOT INCLUDED)

Tape Measure
Level (Magnetic Recommended)
Stud Finder
Electric Drill or Driver
Socket Wrench
9/16" Socket
Marker / Pen / Pencil
STEP 1: Install (3) 2x6" (or larger) wood support boards
across your wall perpendicular to the ground using
general wood screws at these specific heights:
11.5" on center (Bottom Support Board)
49.5" on center (Middle Support Board)
87.5" on center (Top Support Board)

STEP 2: While person 2 holds one Off Grid Rack upright,

vertically level, and flush against wood support boards/
ground, mark pilot holes on your wood support boards
using a marker/pen/pencil.
2020 | SORINEX.COM | 1 of 2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OFF-GRID RACK and is the answer not in the manual?

Questions and answers

Summary of Contents for SORINEX OFF-GRID RACK

  • Page 1 • 11.5” on center (Bottom Support Board) using a marker/pen/pencil. • 49.5” on center (Middle Support Board) • 87.5” on center (Top Support Board) 2020 | SORINEX.COM | 1 of 2...
  • Page 2 This product is not intended for use by children without direct adult supervision. Do not use with incompatible components or alter this product in any way outside of the documents provided by Sorinex Exercise Equipment, Inc., these Off Grid Rack step-by-step instructions for safety, operation and maintenance.

Table of Contents