I N S T A L L A T I O N
STEP 5: POSITION UNIT
Carefully tip unit upright and move into position.
CAUTION: When moving unit into position, be
careful not to rack the cabinet, or damage to the
cam connections may result.
STEP 6: ATTACH ASSEMBLY TO WALL STUDS
Ensure assembly is square using a framing square or by meas-
uring the diagonals. (The diagonals will be equal if the cabinet
is square.)
Level cabinets. Level using shims.
Locate studs and drill 3/16" holes through hanger rail at
top and bottom for screws.
Attach cabinets through hanger rail into wood studs with
2-1/2" cabinet hanging screws.
STEP 7: INSTALL BACK TOE SUPPORT
(skip this step if suspended) install toe support under the bot-
tom fixed shelf. The edge with the notches goes up. The toe
support will have a connector at the left and right side. Snap
into place. Shim as needed.
NOTE: Install toe board after all units have been
assembled. Toe board is very difficult to remove
once installed.
STEP 8: CHECK THE UNIT IS SQUARE
STEP 8: REPEAT STEPS FOR REMAINING UNITS, IF ANY
If your floor-based design consists of a multi-section unit, in-
stall the fixed shelves and vertical panels of the adjacent units.
Inovae Closet Systems by Plato Woodwork | Installation Instructions | 07.2014
10
INSTALL BACK TOE SUPPORT
Need help?
Do you have a question about the ICS and is the answer not in the manual?
Questions and answers