Download Print this page

Sealey VS600.V2 Instructions page 3

Air conditioning leak detection kit

Advertisement

fig.3
a
B
1
6. Maintenance
6.1.
Bulb replacement (fig. 4)
6.1.1. remove the two body screws (c) and pull apart the lamp body, taking care not to damage the lens (e).
6.1.2. disconnect the bulb (I) from the socket (F).
6.1.3. Fit the new bulb to the socket, ensuring that you do not touch the bulb glass (I). Always hold the bulb by the outer edge (H).
touching the glass will shorten the life of the bulb.
6.1.4. reassemble the lamp and refit the two body screws (c).
recycle unwanted materials instead of disposing of them as waste. all tools, accessories and packaging should be
sorted, taken to a recycling centre and disposed of in a manner which is compatible with the environment. When the
product becomes completely unserviceable and requires disposal, dispose of the product according to local
dispose of this product at the end of its working life in compliance with the eu directive on
Waste electrical and electronic equipment (Weee). When the product is no longer required, it must be disposed
of in an environmentally protective way. contact your local solid waste authority for recycling information.
NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.
iMportant: no liability is accepted for incorrect use of this product.
Warranty: Guarantee is 12 months from purchase date, proof of which will be required for any claim.
© Jack sealey limited
c
d
c
e
environmental protection
Weee regulations
Sole uk distributor, Sealey group,
Kempson Way, suffolk Business Park,
Bury st. edmunds, suffolk,
IP32 7Ar
Original Language Version
f
g
i
H
regulations.
01284 757500
01284 703534
fig.4
www.sealey.co.uk
sales@sealey.co.uk
Vs600.V2
Issue: 1 - 08/12/15

Advertisement

loading