VSO/VSXO VSO/VSXO ® ISION ISION ADIANT ADIANT EATERS EATERS SSEMBLY SSEMBLY NSTRUCTION NSTRUCTION ANUAL ANUAL INDEX Section Introduction and Document Index Installation Requirements --------------------------------------------------- 1 Assembly Instructions ------------------------------------------------------- 2 User and Operating Instructions ------------------------------------------ 3 WARNINGS Nortek Global HVAC (UK) Ltd equipment must be installed and maintained in accordance with the relevant provisions of the Gas Safety (Installations and Use) Regulations 1998 for gas fired products.
Introduction. Welcome to the new range of high efficiency and attention is required to ensure that working AmbiRad Vision radiant tube heaters. Local at height regulations are adhered to at the regulations may vary in the country of use and mounting heights specified.
Page 3
2. Assembly Instructions. PLEASE READ this section prior to Please ensure that all packaging is assembly to familiarise yourself with the disposed of in a safe environmentally components and tools you require at the friendly way. various stages of assembly. Carefully open the packaging and check the contents against the For your own safety we recommend the parts and check list.
Page 4
All remaining ‘U’ bolts on the RETURN 2.2.4 Couplers TUBE should also be tightened to achieve a minimum torque setting of 15Nm². For fixing the U bend. Locate and position tube couplers (D) Slide the coupler over the All remaining ‘U’ bolts on the FIRING components ensuring that the rivet stop has TUBE and the first ‘U’...
Page 5
Fig. 1 Tube, Brackets and Turbulator detail Doc No. 700021 Page 5 of 20...
Page 6
2.2.6 U Bend. 2.2.7.1 Overshield Reflectors Slide U bend (C) into the open end of the couplers ensuring the pre-fitted bolts engage in the precut holes. Tighten all four clamping bolts to provide a tight grip between tubes & U bend. To avoid damaging the heater whilst installing we recommend the heater chassis be suspended prior to fitting reflectors.
Page 8
2.2.7.2 Inner Reflectors M8 bolt on the first bracket. Secure using large washers and anti vibration nuts. reflectors must positioned/ attached to the brackets exactly as 3. The slot in other end of the first reflector detailed in the assembly drawings. should align with M8 bolt on the second bracket.
Page 9
2.2.8 Insulation mats. Ensure the 2nd reflector sits on top of the 1st. Using the recommended safety equipment i.e. 5. Locate the M8 bolts on third bracket on this gloves, goggles and a face mask, cover the half to slot in same reflector approx one third back of reflectors with the insulation mats.
Page 11
other and insert M8 self tapping screws 2.2.9 Outer Canopy's provided. 6. Repeat the procedure for 3rd set of outer canopies. 2.2.9.3 Four Module Units 1. Slide on the two halves to cover the centre section of the heaters and fit closing plates to each end (P).
Page 13
2.2.10 End Caps Remove the protective plastic coating. Position the end cap with no tube holes (M) beneath the reflector profile at the U bend end making sure that the end cap engages inside the inner reflector . Fasten to canopy using M5 pozi set pin and washers.
Page 14
Manifold Tube Damper Blade Vacuum Test Point Fitting FLOW Emitter Tube External bead of jointing compound FLOW 2.2.15 Fixing of optional End Mouldings. Internal bead of jointing compound If end mouldings (P) have been ordered (optional item) fit the end mouldings with the Manifold screws provided / quick release clips to the holes in top of the canopy.
Page 20
7. If lockout occurs three times consecutively switch off and isolate the gas and The manufacturer offers a maintenance electricity supplies. service. Call an AmbiRad Service Engineer. Details are available on request. For Service requirements, please contact AmbiRad 3.2. To Switch Off Heater For further technical and service support 1.