Table of contents Page 1. Introduction 1.1 General 1.2 Tools for assembly 2. Aligning the marquee and the base plate 2.1 Laying the base plates 007-008 3. Pre-assembly 3.1 Pre-assembly of posts, bars and braces 010-012 3.2 Assembling the braces 013-014 4.
1.Introduction The following assembly manual describes the installation and assembly of your marquee by using systematic structure. Please follow the instructions continuously and execute step by step. Certain points have additional information if required. !!!Attention!!! Please follow accident prevention regulations Ensure that there is no cable, pipes etc.
1.1 General Please read this manual thoroughly before starting assembly. Perform the assembly stop only if all the points are clear, the components are identified and follow the sequence. Please follow accident prevention regulations. Improper handling, non-adherence of rules may result in mortal injury. Follow the sequence of this assembly manual.
1.2 Tools for assembly Assembly and disassembly should always be done with appropriate Assembly tools. An assembly rod, see image 1, is supplied with each marquee. Additional Site tools and equipment: 3 x towing rope snap hooks (load capacity at least 250 kg) ------------------------------------------------------------------------------------------------ 2 x ratchet or wrench ------------------------------------------------------------------------------------------------...
2.Aligning the marquee and the base plate It is recommended to align the basic dimensions of the marquee to local conditions such as road path, building front and similar. Exact position should be followed when distributing and positioning the base plate. Wrongly or inaccurately positioned base plates will make further assembly difficult.
Page 7
2.1.4 Now stretch line for the marquee width and align at right angle (exact alignment follows). 2.1.5 Measure marquee width from the centre of the 1st base plate to the centre of the 2nd base plate, align base plate parallel to the line and fix with ground anchors (see Fig.
3.1 Pre-assembly of posts, bars and braces Assembly of posts and bars Combine and match all components according to Fig. 4 (page 9) and 5 (page 11). Lay out the components according to the images and following description. 3.1.1 Push the left and right bar into the ridge shoe and connect with pivot pins / screws.
3.2 Assembling the braces Braces should always be mounted (see image 6) and should be removed only during the disassembly of the marquee. The braces consist of diagonally arranged ropes in the roof and walls, alternatively cross braces or diagonal struts can also be used based on statics.
4. Assembling the marquee 4.1 Installation of the truss frame 4.1.1 Align the first pre-assembled trusses with the wall braces, position one person each at the posts for securing the truss. 4.1.2 Likewise, place the second pre-assembled truss vertically (Image 4.1.3 Fix the wall braces already mounted at the first truss with screws and nuts to the second brace.
Assembling the pediment supports Note: Depending on the marquee width, multiple pediment supports may be required and should be installed according to the drawings. 4.3.1 Place the pediment support vertically below the ridge shoe /bar of the corresponding end bar and insert into the intake at the ridge shoes and screw.
5.Assembling the covers Before assembling the cover, all the ground anchors must be placed deep and all braces must be installed and clamped loosely. Important: Do not pull the covers with raw force, because noticeable resistance could also indicate inaccurate alignment in the assembly. If required, pull back again and try or check the accuracy of the assembly.
Page 19
5.1.9 Once all the roof covers are fixed in the bars, these will be tensioned with corresponding tensionless (belt, pressure, fix, expander etc.).
5.2 Side and pediment covers The side and pediment covers are placed at the longitudinal side of the marquee and pediment sides and always consist of loop and eyelet side (image 12, page 22). The covers are fixed into the piping channels of the posts and the crossbeams / curtain pipes.
5.3 Pediments The plans for the marquee pediment consist of 2 pediment covers, an eyelet and a loop side. The inner side of the marquee is marked with visible suture of the loops and the overlaps of the side, which forms the right angle, is covered and welded inward.
6.Disassembly The disassembly of the marquee is simply done in the reverse sequence of the installation, however the following points should be noted. Note: Covers and walls should be dry before assembly to extend the service life and to guarantee cleanliness. Therefore, even the disassembled parts should be sorted and loaded immediately after the disassembly.
7.Maintenance instructions 7.1 Marquee construction 7.1.1 If required, retensioning of the braces and screw connections and roof bracing should be done as follows: - After 3 months service period - After hot periods and frost (Important: Follow operating manual for the installation during winter months!) - After a storm 7.1.2 Firmly and completely placed anchor is absolutely necessary.
8.2 Marquee covers Marquee covers are made of material with low flammability in accordance with DIN 4102 B1 8.3 DIN ISO standards Marquees are based on the following regulations: EN 1090 - 1; DIN EN 13782; DIN EN 1990; DIN EN 1991; DIN EN 1993;...