B ase P lus Installation manual SUMMARY Introduction ..................4 1.1 ▪ Symbols used in the manual ....................4 1.2 ▪ Personnel requirements ......................4 1.3 ▪ Required equipment .........................4 1.4 ▪ Contents of packaging ......................5 Safety ....................5 2.1 ▪ General safety information .......................5 2.2 ▪...
B a s e P l u s Installation manual 1 IntRodUctIon This manual for the Base Plus awning was prepared by the manufacturer to provide necessary information to those authorized to install and perform special maintenance of the product. It is prohibited to remove, rewrite or in any way modify the pages of the manual and their content.
B ase P lus Installation manual 1.4 contents of packaging ▪ The awning is delivered complete with extensible arms, fabric, control (manual or motorized) and any requested optional. InFoRMAtIon And PREcAUtIonS never move the arm supports from the position in which they are supplied. 2 SAFEtY 2.1 general safety information ▪ ▪ during all operations described in this manual, make sure that onLY individuals involved in the work are in the work zone (see chap. 1.2 “Personnel requirements”) . ▪ Do not set objects on the canvas of the awning. ▪...
Ba se P l us Installation manual 3 tEchnIcAL tABLES FoR InStALLAtIon 3.1 table of loads on awning fastening plugs, based on type of ▪ attachment InFoRMAtIon And PREcAUtIonS the calculations of the plugs were made taking into account the class of wind resistance of the awning as per standard En 13561. Wind resistance class 2 WALL InStALLAtIon WIDTH (m) Extraction load on anchoring devices (KN) 1,35 0.90 1.04 1.18...
Bas e P lus Installation manual 3.2 table of suggested anchoring devices ▪ 3.2.1 t ypes of anchoring devices based on base material ▪ Extraction load on anchoring devices (KN) hilti hSt CONCRETE CRACKED CONCRETE HARD NATURAL STONE hilti hSA CONCRETE HARD NATURAL STONE hilti hIt-hY 150 with hAS CONCRETE hilti hIt-RE 500 with hAS CONCRETE HARD NATURAL STONE SOLID BRICK WOOD hilti hIt-hY 50 BETON GAS...
Ba se P l us Installation manual 3.2.2 Sequence for fastening of anchoring devices ▪ MEchAnIcAL AnchoRIng dEVIcE chEMIcAL AnchoRIng dEVIcE 1 ▫ Make a hole with a 1 ▫ Make a hole with a drill bit that is suita- drill bit that is suitable ble for the anchoring anchoring device device...
Bas e P lus Installation manual 4 InStALLAtIon oF MAnUAL AWnIng The Base Plus awning can be either wall-mounted or ceiling-mounted. The instructions below refer to wall-mounting; ceiling mounting is the same. If any optional are provided, first read chapter chapter 6 on optionals AttEntIon Ensure a minimum space of 500 mm between the open awning and any fixed obstacle.
Page 12
B a s e P l u s Installation manual InFoRMAtIon And PREcAUtIonS to make installation easier, you can print this page in A4 format and use it as a template to find the best position for the holes. AttEntIon to AVoId ERRoRS, MAKE SURE thE PRIntoUt ScALE IS In ScALE 1:1, chEcKIng thE MEASURE IndIcAtEd on thE PAPER WIth A RULER oR cALLIPER (BRAcKEt WIdth 102 MM) FIG. 2 rev.03 13.12.12...
B ase P lus Installation manual FIG. 3 5▫ Drill a hole in the wall based on the type of screws available and the type of masonry in the correct po- FIG. 2 sition. 3 ▫ Fasten the manoeuvre rod (C) to the winch. 4.2 Installation of box 4.3...
B a s e P l u s Installation manual 5 InStALLAtIon oF loosen to increase MotoRIzEd AWnIng inclination AttEntIon It IS PRohIBItEd to install the motorized product in an explosive atmosphere. AttEntIon Use a locking switch (with key) if the awning is installed in sensitive locations such as schools, boarding schools, tighten to decrease inclination hospitals, retirement homes, etc.
B ase P lus Installation manual 5.2 Electrical connections and installation ▪ AttEntIon the electrical connections must be performed by qualified personnel and with the electrical energy disconnected. InFoRMAtIon And PREcAUtIonS It is prohibited to connect two or more motors to the same switch due to the risk of induced current which would result in damage to the motors. Installation of the motorized awning is performed with the same procedure as the manual awning, except for the application of the crank rod (Chap.
B a s e P l us Installation manual 7 SPEcIAL MAIntEnAncE 7.1 troubleshooting table ▪ MAnUAL AWnIng PRoBLEMS cAUSES SoLUtIonS Conical rolling of canvas Incorrect symmetry of arms See manual for Assembly, Chap. 7 Roll the canvass all the way back up Uneven fabric thickness MotoRIzEd AWnIng Without electronic control unit...
Need help?
Do you have a question about the Base Plus and is the answer not in the manual?
Questions and answers