PIPE MOUNTING (OPTIONAL)
Unit mounts horizontally on 1 1/4" or 2" IPS pipe by
means of pipe clamp screws. (see Fig. 2). To install,
loosen the pipe clamp screws and slip unit on pipe until it
hits the "stop" inside.
Tighten hardware hand-tight and level unit. When the
unit is level, secure all hardware.
Drain holes are provided to prevent collection of
moisture from condensation.
For proper charcoal filter function, seal around
incoming leads or cable with a suitable fitting or non-
hardening sealer.
Fig. 2 - Side view of pipe mounted luminaire.
WIRING
The service leads should have suitable temperature
rating (See nameplate) and should extend into the
luminaire approximately eight inches. Route service
leads through lead clips to insure against heat damage,
and position all luminaire leads so as to prevent contact
with reflector.
Make all electrical connections in accordance with
the National Electrical Code and any applicable
local code requirements.
Verify that supply voltage is correct by comparing
it to nameplate.
If unit is designated as multivolt or multiwatt,
follow specific instruction.
Do not remove insulated connectors from wires
not needed for required voltage connection.
Terminals are readily accessible on the terminal board
and will accept No. 14 through No. 6 wire. Attach the
service leads to the terminal board as shown on the wiring
diagram.
IF SINGLE VOLTAGE:
All single voltage ballasts are pre-wired such that user
need only connect the supply conductors.
IF MULTIVOLT: (120/208/240/277 volts)
Connect the ballast lead with the insulated terminal to
the desired voltage terminal as indicated on the ballast
terminal nameplate.
g
GE Lighting Solutions • 1-888-MY-GE-LED • www.gelightingsolutions.com
GE Lighting Solutions is a subsidiary of the General Electric Company. Evolve and other trademarks belong to GE Lighting Solutions. The GE brand and logo are trademarks of the General Electric Company.
© 2011 GE Lighting Solutions. Information provided is subject to change without notice. All values are design or typical values when measured under laboratory conditions.
IF MULTIWATT:
Multiwatt ballasts are available in various combina-
tions of wattage. See wiring instructions on wiring
tag inside the luminaire.
FINAL ASSEMBLY
To assemble luminaire, follow the steps below:
1. Engage the polarized socket connector
2. Re-install reflector.
3. Install lamp.
4. Align door with hinges and close. Tighten the one
captive screw.
LAMP INSTALLATION
Use only lamps specified on nameplate. Observe
lamp manufacturer's recommendations and
restrictions on lamp operation, particularly ballast
type, burning position, etc.
Lamp Tightness – Mogul Base Lamp: The lamp
should be securely inserted to the NEMA-EEI specified
torque of 35 inch-pounds, which is best achieved by very
firm tightening sufficient to fully depress and load the
center contact of the socket.
Lamp Tightness – Medium Base Lamp: The lamp
should be tightened to a light firmness sufficient to
depress the center contact.
M A I N T E N A N C E
It will occasionally be necessary to clean the outside of
the refractor to maintain light levels. Frequency of
cleaning will depend on the ambient dirt levels and the
minimum light level acceptable to the user. The refractor
should be washed in a solution of warm water and any
mild, nonabrasive household detergent, rinsed with clean
water and wiped dry. Should the optical assembly
become dirty on the inside, wipe the reflector and clean
the refractor in the above manner.
1
- 8 8 8
-
6 9
-
4 3 5 3 3
-
CAUTION
Risk of burn
• Allow lamp/fixture to cool before
handling
WARNING
Risk of burn
• Do not touch operating luminaire
35-201461-87 (11/99)