Advertisement

Fast & Fluid Management – SK350
FAST & FLUID MANAGEMENT
SK350
ENGLISH
V 2.0-2015
page 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SK350 and is the answer not in the manual?

Questions and answers

Summary of Contents for Fast & Fluid Management SK350

  • Page 1 Fast & Fluid Management – SK350 FAST & FLUID MANAGEMENT SK350 ENGLISH V 2.0-2015 page 1...
  • Page 2: Table Of Contents

    Fast & Fluid Management – SK350 Table of Contents SK350 Manual Introduction, warranty & CE certification Pag. 3 Main SK350 components Pag. 4 Safety instructions Pag. 5 Installation Pag. 6 – 8 Operation Pag. 9 – 12 Maintenance Pag. 13 Problem solving Pag.
  • Page 3 Fast & Fluid Management – SK350 Introduction & warranty Introduction By selecting a Fast & Fluid Management shaker you have opted for a product which is the result of intensive research. Top-quality components, craftsmanship and a modern ergonomic design all serve to guarantee a long service life and a high degree of user friendliness.
  • Page 4: Main Sk350 Components

    Fast & Fluid Management – SK350 Main SK350 components 1. Top lid 2. Keyboard & Emergency stop button 3. Transformer 4. Power Board 5. Removable front panel 6. Clamping plate 7. Super strut – suspension 8. Door handle 9. Shaker frame 10.
  • Page 5: Safety Instructions

    Specific safety instructions in this manual Attention! Failure to remove the frame lock correctly can result in severe damage to your SK350 when in operation. Please take care! Attention! To prevent damage, the SK350 may only be connected to either 220-240V/16A/50Hz power grids.
  • Page 6: Installation

    Be careful not to damage the body and surfaces of your SK350 with any tools while unpacking it. Take care not to accidentally close the door before finishing installation, as it can then only be unlocked power on the machine.
  • Page 7 Tip: before locking the adjustable feet, start a mixing cycle with a small load (<5kg). While the SK350 runs, check if all four feet are firmly in contact with the floor and then lock them. V 2.0-2015 page 7...
  • Page 8 Connect the power cable Ensure the emergency stop is to the socket at the rear unlocked (turn clockwise). of the machine. Attention! To prevent damage, the SK350 may only be connected to either 220-240V/16A/50Hz power grids. V 2.0-2015 page 8...
  • Page 9: Operation

    (e.g. for maintenance) there is only power led is lighted-ON. one way of achieving this: unplug the power connector at the back of the machine. Attention! To prevent damage, the SK350 may only be connected to either 220-240V/16A/50Hz power grids. V 2.0-2015 page 9...
  • Page 10 Fast & Fluid Management – SK350 Step 2 - Correct placement of cans and other containers > > Place one or more Place filler disc on lid to Remove the can handle containers at prevent displacement before shaking. When gravitational center of during operation.
  • Page 11 Fast & Fluid Management – SK350 B - Operating the SK350 Step 1 - Place can, choose the shaking time and push the start key > > Place the container in Close door. Choose shaking time T1, the can table center,...
  • Page 12 Fast & Fluid Management – SK350 C - User of the SK350 Keyboard Power Led Emergency Start Start Start Stop button Check if the machine has been correctly installed and power on Turn the emergency stop clockwise to unlock Open the door and container(s) inside as described in the chapter “operation” step 2.
  • Page 13: Maintenance

    Fast & Fluid Management – SK350 Maintenance Keep your SK350 clean and free of paint residue > Remove all spilt paint Though the SK350 is from accessible parts designed to be completely (especially clamping plate maintenance free, periodic spindles). greasing of moving parts will...
  • Page 14: Problem Solving

    Fast & Fluid Management – SK350 Problem solving Introduction Before calling your machine supplier or Service Department, please check whether you can solve the problem yourself. If you cannot, then call the Service Department for advice. Have the model number and serial number at hand (these can be found on the silver sticker at the back of the machine).
  • Page 15: Service And Support, Fuses

    Fast & Fluid Management – SK350 Machine starts shaking Too much spindle resistance Clean the spindles and lubricate before the container has Clamping plate force incorrectly Call service been clamped Clamping plate will not go Clamping plate is jammed call service...
  • Page 16: Specifications

    Fast & Fluid Management – SK350 Specifications Maximum product weight 35 kg Timer Default shaking time: T1=30sec; T2=60sec.; T3=150sec T1+T2=1min.&30sec; T1+T3=3min.; T2+T3=3min.&30sec.; T1+T2+T3=4min. Maximum product size (H x W x D) 45 x 35 x 35 cm Minimum product height...
  • Page 17: Electrical Wiring Diagram

    Fast & Fluid Management – SK350 Electrical wiring diagram V 2.0-2015 page 17...
  • Page 18: Contributing To The Protection Of The Environment

    Fast & Fluid Management – SK350 Contributing to the Protection of the Environment Packaging Material The packaging protects the machine against damage during transport. The packaging material was chosen based on its limited impact on the environment and its inherent possibilities for waste-disposal.
  • Page 19 Fast & Fluid Management – SK350 © Fast & Fluid Management B.V. 2015 www.Fast-Fluid.com V 2.0-2015 page 19...

Table of Contents