Precautions On Using Demolition Hammer; Specifications; Standard Accessories - Hitachi H 41SC Handling Instructions Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 3
English
PRECAUTIONS ON USING DEMOLITION
HAMMER
1. Wear ear protectors
Exposure to noise can cause hearing loss.
2. Use auxiliary handles supplied with the tool.
Loss of control can cause personal injury.

SPECIFICATIONS

Voltage (by areas)*
Power Input*
Full-load Impact Rate
Weight (without cord, side handle)
* Be sure to check the nameplate on product as it is subject to change by areas.

STANDARD ACCESSORIES

(1) Case ..........................................................................1
(2) Bull Point ......................................................................1
(3) Side Handle ..................................................................1
Standard accessories are subject to change without
notice.
OPTIONAL ACCESSORIES (sold separately)
NOTE
The round type bit with a collar cannot be attached.
○ Crushing
(1) Bull Point
Overall Length: 280, 450 mm
○ Asphalt Cutting
(1) Cutter
○ Surface Roughing
(1) Bushing Tool
○ Tamping
(1) Rammer
4
(2) Shank
(2) Shank
3. Do not touch the bit during or immediately after
operation. The bit becomes very hot during operation
and could cause serious burns.
4. Before starting to break, chip or drill into a wall, fl oor or
ceiling, thoroughly confi rm that such items as electric
cables or conduits are not buried inside.
(110 V, 115 V, 120 V, 127 V, 220 V, 230 V, 240 V)
1050 W
3000/min
5.0 kg
○ Syringe (for chip removal)
○ Scooping Work
○ Cylinder case cover (For heat insulation of cylinder
case)
Cylinder case cover (rubber)
○ Hammer Grease A
500 g (in a can)
70 g (in a tube)
30 g (in a tube)
Optional accessories are subject to change without
notice.
APPLICATIONS
Breaking concrete, chipping off concrete, grooving, bar
cutting, and driving piles.
Application examples:
Installation
of
piping
installation, machinery installation, water supply and
drainage work, interior jobs, harbor facilities and other civil
engineering work.
(1) Scoop
and
wiring,
sanitary
facility

Advertisement

Table of Contents
loading

Table of Contents