Download Print this page

Installing The Rack - Panasonic CWFE14CM Installation Manual

Wall mount drying rack

Advertisement

5.
Caution
How to
1.
Attaching mounting brackets
Install
● Fix 2 mounting brackets with 3 screws (truss φ4x40) per
bracket into a stud.
Anti-drop metal bracket
Stud (Column)
Mounting bracket
Caution
● Make sure to install the mounting brackets in line with vertical center lines of inner
studs/columns.
● Two mounting brackets should be positioned at the same height against the floor.
(or the rack cannot be installed properly.)
2.

Installing the Rack

● Press the rack slightly against the mounting brackets and lower the rack keeping it level. Hook the rack on the brackets securely.
Installation
Rack
Mounting
Bracket
* Be careful not to damage the wall finish.
6.
Post-
1.
Make sure the rack is securely attached to
the mounting brackets
installation
drawing above).
check
(Move the rack back and forth)
2.
Remove the tape from the lid/
operation cord.
3.
Check the rod operation.
① Pull out the rod by fully pulling the
operation cord with the operation ball.
② To store the rod, pull the operation
cord on the other side. Make sure the
rack closes.
* Do not stand in front of the rack while
handling the pull cord. The rod may
pop out and cause injuries.
If installing above a window, before installing, complete the interior
finishing and installation of curtain rails.
Stud (Column)
Distance between
the mounting
bracket and the
curtain rail
Mounting
bracket
Fix mounting brackets
* Do not install the bracket
upside down.
Top
Fixing bracket
1 0
Mounting bracket
fixing screw
Always fix the mounting
Caution
brackets to inner columns
(studs). Otherwise these
should be reinforced with
alternatives, like crosspieces.
(it is important to attach securely to mounting brackets)
Press the rack slightly against the
Completion drawing
mounting brackets and lower the
rack keeping it level. Hook the
rack on the brackets.
Rack
Mounting
bracket
Caution
(refer to the finished
(mounting strength is important.)
Caution
3 0
1 5
1 0
1 0
* Make preliminary holes with the screws (min 3 screws/crosspiece) which dig more
than 40mm into the base before fixing. Do not use debris of particle boards.
(Follow the same steps below for anti-drop metal brackets)
① Make a pilot hole using a 5mm drill.
② Hammer in a specialized concrete anchor and fix with screws.
About 55mm
* Use a specialized concrete anchor, not a general-purpose one.
Check that it is securely
attached to the brackets.
Rack
Mounting
Bracket
Rack
Move rack back and forth to ensure it is
securely attached.
* Do not use other rods other than the designated one.
How to mount the rod
Operation
ball
How to remove the rod
CAUTION
● Install the rack on an area that will
support its weight. (Do not attach
directly to the plasterboard/ALC)
(Unit: mm)
Improper installation may cause injury
due to falling.
If a curtain rail/box is more
than 120mm deep
Install a crosspiece to avoid the rail. Otherwise
the curtain rail/ box prevents the rod from
moving properly.
Crosspiece, at least 1116/170 (not included)
Crosspiece
Sectional
view
rack
A dimension:
Depth of curtain rail/box
(If A is more than 120mm)
For concrete walls
(Anchors not inlcuded)
φ5
Anchor
Concrete anchor (8 pcs • CWFP099)
3.
Installation of anti drop metal brackets
Always install the anti drop brackets to
Caution
prevent falling.
● After installing the rack, install the anti drop metal
brackets on the top of the rack (left and right).
(* After installation, please make sure that the rack
does not come off)
Stud (Column)
Fixing screw for
anti-drop metal
bracket (truss φ4×30)
Anti drop
metal fitting
Rack
Make sure the
bracket is touching
the rack
About the rod
... Hold the arm component and place the rod on the rod support.
Caution
...Hold the arm, then push the rod up.
Thickness=A-120mm
Plaster board
Effective digging length
to the base
More than 40mm
Fix to
the stud
Set both ends of the
rod before storing the
rack.
The rod may collide with the
rack and cause damage.
D0414-1104

Advertisement

loading