Dear Customer, Our compliments for having chosen a top-quality Immergas product, able to assure well-being and safety for a long period of time. As an Immergas customer you can also count on a qualified after-sales service, prepared and updated to guarantee constant efficiency of your heat pump. Read the following pages carefully: you will be able to draw useful suggestions regarding the correct use of the appliance.
INDEX Safety precautions ..........5 Installing the chiller lines......... 15 Pump down procedure........26 1.1 Hazard............5 5.1 Chiller line geometric limits and 8.1 Purpose of pump down......26 Unit specifications..........6 installation examples........15 8.2 Precautions to take before performing 2.1 Main dimensions..........
- This manual explains the installation methods leaking coolant to avoid serious injury. unit, such animals could cause malfunctions of an Immergas Water-Air heat pump system. - If the heat pump is installed in a closed room, and/or cause smoke emissions or fires. The user...
UNIT SPECIFICATIONS. MAIN DIMENSIONS. Audax Pro 5 54.1 Audax Pro 8 and 10 2.2 OUTDOOR UNIT SPECIFICATIONS. Unit of meas- Type Audax Pro 5 Audax Pro 8 Audax Pro 10 ure- ment Power Supply 220 ~ 240 V AC / 1 F / 50 Hz...
- The unit must be installed in a position in which the condensate it generates and the water resulting from defrosting can drain out normally. Do not hesitate to contact Immergas Customer Assistance if you are unable to satisfy all the above conditions. The coolant-air exchanger must always be kept free of sand and sea water.
3.3 MINIMUM INSTALLATION DISTANCES FOR INDIVIDUAL UNITS. 300 min. 600 min. With the back side of the unit With the front side of the unit With three sides of the unit facing facing a wall facing a wall a wall 300 min.
Base surfaces Structure designed to eliminate the residual vibrations that the unit could transmit to the outdoor unit mount structure (not supplied by Immergas). Rubber shock absorbers (not supplied by Immergas) selected to eliminate the vibrations that the mount structure could...
- Prevent dust and debris from entering the unit to collect and drain the condensate that drainage hose. may drip from the unit. ≥ 50 mm (Audax Pro 5) ≥ 100 mm (Audax Pro 8 / 10) Audax Pro 5 Audax Pro 8 and 10 Ø20 drainage hole...
3.8 INSTALLING THE UNIT IN HARSH CLIMATES. N.B.: if installing the unit in harsh climates, you must follow all the instructions below. - The effects of the wind can be minimised by installing the unit with the intake side facing a wall.
ELECTRICAL CONNECTIONS. 4.1 GENERAL CONNECTION CONFIGURATION. SYSTEM INTEGRATING RE- UNIT SUPPLY OUTDOOR UNIT VOLTAGE SISTANCE SUPPLY VOLTAGE SUPPLY VOLTAGE Mono-phase Mono-phase Mono-phase 2 230Vac 2 230Vac 2 230Vac PROTECTION conductors conductors conductors SWITCHES DOMESTIC HOT WATER TANK OUTDOOR UNIT INDOOR UNIT COMMUNICATION CABLE...
4.4 TERMINAL BOARD FEATURES. Audax Pro 5 - Supply voltage in mono-phase AC. M4 screw supply voltage M4 screw communica- tion bus 10.1 11.4 10.1 11.4 Audax Pro 8 and 10 - Supply voltage in mono-phase AC. Electric supply voltage...
4.5 SUPPLY VOLTAGE CABLE - Otherwise, condenser duration could be - The power cable must be connected to a 230V CONNECTION. jeopardised. Should imbalance exceed 4%, the ±10% / 50Hz mains, respecting L-N polarity Attention: indoor unit would stop and an error would be and the earthing connection ;...
The maximum lengths of the chiller lines are listed below, based on the condensing unit model and the type of installation (fig. 5-1). Audax Pro Audax Pro 5 8 and 10 ≤ 30 m ≤ 50 m ≤ 20 m ≤...
5.2 PIPE CUTTING AND FLARING Attention: during deburring, the pipe must N.B.: tightening to an excessive torque can 1 Make sure you have all the equipment neces- be facing downward to prevent shavings from cause coolant to leak. sary: pipe cutter, deburring tool, flaring tool, getting into it (see fig.
5.3 SELECTING CHILLER LINE 5.4 INSULATING THE CHILLER LINES. 5.5 WELDING THE PIPES. INSULATION. - The insulation must only be laid after having - Make sure there is no moisture inside the pipes - The gas and liquid chiller lines must be insu- made sure that there are no coolant leaks on - Make sure there are no foreign objects inside lated with materials selected based on their...
After having repaired any leaks, you must maintain pressure at 1.0 MPa putting the circuit under vacuum and drying it. at least and check for leaks again. Manometric unit Manometric unit Audax Pro 5 Audax Pro 8 and 10 High pres- Low pressure sure side...
5.8 PUTTING UNDER DRYING VACUUM. Audax Pro 5 Audax Pro 8 and 10 - To prevent foreign substances from getting into the circuit and to ensure the essential resistance Manometric unit to the pressures in play, it is fundamental that Manometric unit only an R-410A manometric unit be used.
R-410A is a blend of several coolants. For this greater than 5 tonnes of CO equivalents), the - Audax Pro 5: 1.2 kg reason, it must be put into the chiller circuit only installer (or the person responsible for final in its liquid phase.
5.13 TOPPING UP THE LOAD. 1 Open the valve on the gas side after 20 min- 5.14 SERVICE VALVE R-410A is a blend of several coolants. For this utes of operation. • Closing the valve. reason, it must be put into the chiller circuit only 2 Open the valve on the pressure gauge mani- 1 Remove the valve cover and turn the stem in its liquid phase.
Pressing it twice: Completes the Operating Test Reset Data display mode Refer to the instructions that appear for the data display mode Audax Pro 5 Audax Pro 8 and 10 1 2 3 4 1 2 3 4 23 23...
7.2 DATA DISPLAY MODE Pressing the K4 button provides the information on the system status shown in figure 7-2. Instructions No. of times it is Meaning of the instruc- Unit pressed tion Segment 1 Segment 2 Segment 3 Segment 4 Communication status Tens of Tx Tx Unit...
7.3 MICRO-SWITCH SETTING. Editing the micro-switch setting on the board, there are various operating modes available, as per figure 7-3 for Audax Pro 5 and figure 7-4 for Audax Pro 8 and 10. ON (default) Notes Manual Orientation Automatic Orientation...
PUMP DOWN PROCE- - Transfer as much coolant as possible to an 8.4 TRANSFERRING THE COOLANT external tank in order to accumulate no more INTO AN EXTERNAL TANK BEFORE DURE. PERFORMING PUMP DOWN. than 5 kg in the outdoor unit (see parag. 8.4 for 8.1 PURPOSE OF PUMP DOWN.
Also close the gas service valve as soon as the low side pressure goes below 0. 7 Press the reset button to abandon the Stop procedure. Audax Pro 5 Audax Pro 8 and 10 Manometric unit Manometric unit High pres-...
COMPLETING INSTALLATION. 9.1 CHECKS AT THE END OF INSTALLATION. Once installation is complete, check the fol- lowing: Check the conditions of the inner and outer surface. Can there be short circuits? Outdoor unit Is the installation position well-ventilated and are the required spaces free? Are the units secured well? Installation Check the conditions of the inner and outer surfaces.
YEARLY UNIT CHECK AND MAINTENANCE. The following checks and maintenance should be performed at least once a year. - Visually check for water leaks or oxidation from/on connections. - Visually check that the safety and control devices have not been tampered with and/or short-circuited.
- The components used as spare parts must be that concern it. approved by Immergas - The electrical supply voltage must always be cut off before cutting off the hydraulic supply. - Regularly check safety valve operation, making it open to make sure water flows out with no problem.